Laserfiche WebLink
VI. Job Creation: This section describes the number of full-time, part-time, and <br />temporary jobs created by effectuating the Agreement. <br />This Summary Report and Agreement are to be made available for public inspection prior <br />to the approval of the Agreement. <br />I. SALIENT POINTS OF THE AGREEMENT <br />A. Project Description <br />The proposed project is located at 201 West 3rd Street, at the northeast corner of <br />Broadway and 3rd Street. Caribou Industries, a local developer and property owner in the <br />City, proposes to replace the existing City -owned, 3-level parking garage with a mixed - <br />use development containing 171 housing units (with 19 for low income residents), a 75- <br />room boutique hotel, 13,419 square feet of commercial space (including retail and <br />food/beverage establishments), and rooftop amenities ancillary to residential and hotel <br />uses. <br />The development would be comprised of two buildings: a 16-story, 194-foot-tall mixed - <br />use (residential and commercial) building and a 10-story, 128-foot-tall hotel building. The <br />buildings would be separated by an extension of Sycamore Street from the north edge of <br />the project site to West 3rd Street. The proposed project would provide 490total structured <br />parking spaces, including 211 public parking spaces and the hotel will provide 83 parking <br />spaces. <br />The Agreement is with Caribou Industries, who proposes to redevelop an aging city - <br />owned public parking structure at 210 W. 3'd Street into a residential and hotel project that <br />will benefit from the economic development subsidy: <br />Caribou Industries <br />1130 N Broadway St <br />Santa Ana, CA 92701 <br />B. City Responsibilities <br />This Agreement requires the City to: <br />1. Provide the land. <br />2. Fund the costs for public improvements to ready the site for development. This will <br />include the demolition of the existing parking structure, preparation of the site for <br />development, the construction of Sycamore Street reconnection and construction <br />of 211 public parking spaces to replace the existing parking currently provided at <br />the 3'd and Broadway parking structure. The estimated cost for public <br />improvements is $7 million for the construction of the 211 public parking spaces <br />and $6 million for the additional public improvements. <br />z <br />75A-206 <br />