My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH FOR CARIBOU INDUSTRIES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
75A - PH FOR CARIBOU INDUSTRIES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:41:15 PM
Creation date
11/12/2020 3:25:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® PLACEWORKS <br />greenhouse gas emissions are considered less than significant. There are no substantial changes in <br />the circumstances, or new information that would require the preparation of a subsequent EIR. <br />0-25 The Certified EIR includes all feasible mitigation necessary to mitigate the potential impacts related <br />to implementation of the Transit Zoning Code. These mitigation measures have been incorporated <br />into the Addendum. During the environmental processing of Certified EIR, no comments were <br />received on the mitigation measures and no challenge to the Certified EIR was filed. Since this issue <br />was not raised during the public comment period or at the hearings for the Certified EIR, there is no <br />longer standing to litigate this issue under CEQA. <br />0-26 This comment is noted, and no response is required. <br />0-27 The Commenter asserts that the Proposed Project requires an Environmental Impact Report. The <br />City of Santa Ana prepared an EIRAddendum consistentwith Sections 15161 and 15164of the CEQA <br />Guidelines to determine if there were any new significant impacts associated with the Proposed <br />Project that were not previously addressed in the Transit Zoning Code EIR. As discussed throughout <br />the Addendum, the Proposed Project does not meet the criteria identified in Section 15162 of the <br />State CEQA Guidelines requiring preparation of a subsequent or supplemental EIR. Additionally, as <br />shown in responses 0-1 through 0-23, the Proposed Project has been adequately analyzed in the <br />Addendum. As a result, no additional CEQA analysis is necessary for the Proposed Project. However, <br />your comment is hereby noted and will be forwarded to the decisionmakers for the Proposed <br />Project. <br />75A-482 November 2020 1 Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.