My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT FOR ASPHALT AND STORM DRAIN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
12/01/2020
>
25G - AGMT FOR ASPHALT AND STORM DRAIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 12:15:58 PM
Creation date
11/25/2020 12:10:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
12/1/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY RATE SCHEDULES <br />T.E. Roberts, Inc. and Structures Unlimited <br />«P <br />Ro� <br />berts <br />INCORPORATED <br />10/19/2020 <br />City of Santa Ana <br />On -Call Emergency Asphalt Concrete, Concrete and Storm Drain Repair Services <br />President -Timothy Roberts <br />Project Managers -Justin Roberts, Gilbert <br />Hartwell <br />Superintendents- Dave Pope, Dave Klein, <br />Bob Hartwell, <br />Francisco Romero, Javier Magana, Tom Zimprich <br />Hourly <br />Straight <br />Time <br />Hourly <br />LABOR <br />Rates <br />EQUIPMENT <br />Rates <br />Project Manager <br />$135.25 <br />Large Excavator <br />$121.00 <br />Superintendent -Op Eng Gr 8 <br />$132.00 <br />Medium Excavator <br />$110.00 <br />Foreman -Operating Engineer Gr 8 <br />$127.12 <br />Small Excavator <br />$99.00 <br />Foreman -Laborer Group 5 <br />$108.92 <br />Back Hoe <br />$46.20 <br />Operator- Operating Engineer Gr 8 <br />$122.25 <br />Air Compressor w/JH <br />$22.00 <br />Laborer- Laborer Group 1 <br />$100.80 <br />Dump Truck/Super 10 <br />$49.50 <br />Pipe layer- Laborer Group 4 <br />$105.11 <br />Pickup Truck or Van <br />$27.50 <br />Welder- Laborer Group 5 <br />$105.67 <br />Crew Truck <br />$33.00 <br />Teamster- Teamster Group 3 <br />$97.35 <br />Flatbed Truck <br />$27.50 <br />Bed Trailer <br />$49.50 <br />Materials <br />cost plus 15% <br />Truck and Pup <br />$82.50 <br />Bonds -if required <br />1.5% of total <br />Water Truck <br />$38.50 <br />SUBCONTRACTORS <br />Cost plus 10%for <br />Sweeper <br />$79.20 <br />Structures Unlimited -concrete structures <br />first $5,000, then <br />Wheel Loader <br />$60.50 <br />Skip Loader <br />$44.00 <br />Skid Steer/Bobcat <br />$44.00 <br />Asphalt Zipper <br />$88.00 <br />Arrowboard <br />$16.50 <br />25G-117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.