My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDS GROUP
Clerk
>
Contracts / Agreements
>
I
>
IDS GROUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:55:02 AM
Creation date
12/4/2020 3:01:46 PM
Metadata
Fields
Template:
Contracts
Company Name
IDS GROUP
Contract #
A-2020-230-01
Agency
Public Works
Council Approval Date
11/17/2020
Expiration Date
11/16/2023
Insurance Exp Date
11/12/2023
Destruction Year
2028
Notes
CTRAX
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br />Space Planning and Architectural Consulting Services <br />RFP No. 20-040 <br />John Silber, AIA <br />Project Manager / Principal Architect <br />Mr. Silber is an award -winning architect covering a broad range of urban <br />projects, including a number in areas of special interest, such as the link public <br />education creates between culture and economic vitality. He has mastered the <br />interface between community design expectations, urban in -fill architecture and <br />modern code standards for fire 1 life safety, energy, and accessibility. John has <br />been an active member of the architecture and urban design of Southern <br />California. <br />Education <br />■ Masters of Architecture, Southern California Institute of Architecture <br />Professional Credentials <br />■ Professional Architect: CA (#15573) <br />Professional Affiliations <br />■ American Institute of Architects (AIA) <br />Relevant Project Experience <br />■ Alhambra Campus Tenant Improvement Building #2 and #3, Alhambra, CA: IDS is providing <br />architectural, structural, mechanical engineering (HVAC & plumbing) and electrical engineering for a <br />tenant improvement involving a corporate office and engineering lab in existing buildings. Area of work <br />in building 3 is 3,900 SF, and building 2 is 11,806 SF. <br />As Principal Architect, John oversaw the project and coordination. The scope of the project includes <br />field verifying existing conditions, construction documents, space consolidation, and renovation, <br />restroom design, and ADA compliance. <br />■ City of Azusa Light & Water Department, Azusa, CA: Principal Architect providing architectural <br />design service for the remodeling of the building to improve the safety and security for its employees. <br />Scope of services include reconfiguration of an office supply and equipment storage room into an office <br />with four workstations, ADA upgrades, and interior finishes. <br />■ City of Irvine Workspace Relocation and Tenant Improvements, Irvine, CA: Project Manager for <br />the tenant improvement of the expansion and relocation of various departments in the City of Irvine <br />Civic Center. The project primarily focused on the expansion of the existing police department (Public <br />Safety) as a result of recent population growth within the city in the last few years. <br />■ West Basin Municipal Water District, Donald L. Dear Building, Carson, CA: Principal Architect. <br />IDS was hired to perform a Preliminary Design Report (P.D.R.) where we would review and evaluate <br />the existing building as well as a preliminary space plan completed in 2015. We were to asses both the <br />existing and the 2015 proposed plan for Architectural, Mechanical, Electrical and Plumbing needs. <br />■ City of La Palma City Yard Offices, La Palma, CA: Principal Architect. These facilities were in a worn <br />condition, were a poor match to current space needs, and did not comply with ADA/Accessibility <br />requirements. The floor plan wasted space thanks to inefficient corridor circulation and needless <br />AA IDS GROUP 25G-45 APPENDIX <br />
The URL can be used to link to this page
Your browser does not support the video tag.