Laserfiche WebLink
Craig Biggi, LEED AP BD+C (cont) <br />Gruen Associates <br />Project Manager and Principal Designer <br />PROJECT AWARDS (cont.) <br />RELEVANT PROJECTS (cunt.) <br />Metro Universal City Station <br />Pedestrian Bridge <br />UC Irvine Classroom 1131, Moot Courtand Large Classroom, Irvine, CA. Craig <br />• 2016 Outstanding Bridge <br />was the Project Designer for a series of tenant improvements for the School of Law. <br />Project of the Year Award, <br />American Society of Civil <br />Community Center and Gymnasium at Cerritos Park, Cerritos, CA. Craig <br />Engineers (A SCE), Metropolitan <br />Las Angeles Branch <br />nedthe15,936-SFcommuni , program <br />desi g � center, developed the p g expansion <br />of existing lobby and office areas, as well as to interior/exterior/site upgrades at <br />Hollywood Bowl Shell Renovation <br />Cerritos Park. Phase I included the interior remodeling of four newly -accessible <br />and Stage Replacement <br />spaces along with a new reception office, expanded central and new exterior <br />• Civic Award, Los Angeles Business <br />Business Council <br />a <br />g� g p story conversion of loss storage to a computer classroom, g vendin alcoves new <br />multi-purpose room configuration and upgrades, lighting, floor and ceiling finishes, <br />Southwest Museum Gallery at <br />new bleachers, ADA transition ramps, lobby storefront and improvements, and a <br />LACMA West <br />new exhibit honoring retired 4th District County Supervisor Don Knabe. <br />• 1998 "Spirit of the Southwest <br />Award" for Outstanding <br />Achievement in the <br />Hollywood Bowl Shell Renovation and Stage Replacement, Los Angeles, CA. <br />Development of the Project, Los <br />The project included the complete replacement of the 1927 shell, as well as all of the <br />Angeles County Museum of Art <br />back -of -house facilities. Technical solutions to acoustical problems were resolved <br />(LACMA) <br />through innovative project delivery techniques including the Design -Build solution to <br />LAX Central Utility Plant <br />the complicated acoustic "halo" over the orchestra. Craig was Project Designer for <br />Replacement <br />Phase I of the understage renovation. <br />• 2016 Merit Award, Design -Build <br />Institute ofAmericaRe (DBIA), <br />Western Pacific Region <br />CAHSRA Burbank -Anaheim Corridor Burbank -Anaheim CA. CraigIsworkin <br />> > g <br />• 2016 Honor Award - <br />with the Gruen Associates' team of planners, urban designers and architects for the <br />Engineering Excellence <br />preparation of station design concepts and a station area vision for proposed stations <br />Awards, American Council of <br />at Norwalk/Santa Fe Springs, Fullerton and Anaheim. The goal will be to develop <br />Engineering Companies (ACEC) <br />California <br />15% design plans that close) integrate bicycle and pedestrian infrastructure, local <br />g p y g y <br />• 2015 Best Projects Award - <br />transit connections and parking options, while developing Iconic station designs that <br />Energy/Industrial Category, <br />include retail and passenger amenities. <br />Engineering News -Record, <br />California Region <br />• 2015 Outstanding Architectural <br />California Science Center Technology Hall I Hall of Health Remodel, <br />Engineering Project of the Year <br />Los Angeles, CA. Craig designed the future Administration Offices located <br />Award, American Society of Civil <br />in Exposition Park. Two existing exhibit buildings were remodeled to include <br />Engineers, Metropolitan Los <br />approximately 39,700 SF of office space. The project incorporates the use of new <br />Angeles Branch <br />skylights, exterior windows, and indirect lighting to transform these existing buildings <br />Metro Orange Line Canoga <br />into comfortable workplace environments. <br />Extension PE Transportation <br />Corridor <br />Tokio Marine Insurance Test Fits, Encino, CA. Craig is the Project Manager and <br />•2013Coence,LyImpact <br />of Excellence, Los Angeles <br />les <br />Desi Designer providing fourtestfto tlonsforTokioMarineInsurance'snewoffices ace. <br />g p g p p <br />Business Council <br />With growth anticipated beyond 170 employees, each space must accommodate <br />• 2013 Large Transit Project <br />different office sizes (150, 225 and 300 SF) and workstations (84 SF) that can be <br />of the Year, California <br />adjusted, if needed, during program verification, along with conference rooms, and <br />Transportation Foundation <br />(CTF) <br />other ancillary areas to Identify appropriate lease space options. Test fits for spaces <br />range from 28,000 SF to 33,000 SF and will help verify the areas indicated in the <br />Space Requirements Summary, will establish a layout plan, will help verify the <br />program areas and show potential layout options within a lease space. <br />City of Santa Ana <br />RFP for Space Planning and Architectural Consulting Service 27 GRUENASSCCIATES <br />RFP No. 20-040 25G 349 ACIU1 IITLCTLJOL PLKTVAG INTLFIQF� Loh LSOA'__ <br />