Laserfiche WebLink
Keenan E. Bull, PE <br />Gannett Fleming <br />Civil Engineer <br />EDUCATION PROFESSIONAL EXPERIENCE <br />MS, Civil Engineering, Missouri Keenan has more than 16 years' experience in civil engineering, and as a design <br />University of Science and <br />Technology, Rolla, 2009 engineer and project manager for private and municipal water and wastewater <br />treatment operations, desalter (Reverse Osmosis) facilities, water distribution <br />BS, Civil Engineering, Missouri systems, wastewater collection systems, large -diameter pipelines, waterconveyance <br />University of Science and systems, and water storage facilities. Proficiencies include the design, planning, and <br />Technology, Rolla, 2001 constructionlretrofit of water pumping stations, water and wastewatertreatment facility <br />PROFESSIONAL yard piping, above -ground water storage tanks, and buried or exposed transmission <br />REGISTRATION 1 and distribution pipelines. Expertly managed the coordination of design personnel <br />AFFILIATION and subconsultants In the development of design drawings and specifications for <br />California - (No. 138461) (2016) construction as Well as development and completion of regulatory permit applications. <br />North Dakota - No. 10549 (2016) RELEVANT PROJECTS <br />Illinois — No. 062.059597 (2007) Palos Verdes Recycled -Water Pipeline, Carson, CA. * Keenan was the Project <br />PE (Civil): Missouri - No. Task Leader for final design and environmental assessment for a recycled water <br />2006019594 (2006) pipeline conveying water through Torrance and Palos Verdes Estates. The project <br />includes approximately 16,000 feet of eight-to-10-inch diameter pipeline, a booster <br />pump station, metering vault, and connection to the Palos Verdes Golf Course and <br />several parks, schools, and other irrigation customers along the route. <br />Alvarado Trunk Sewer Phase IV Replacement Project, San Diego, CA. * For <br />the City of San Diego, Keenan was the QAIQC Lead on the project involving deep <br />gravity sewer ranging in depth from 15 feet to 30 feet. The scope also includes <br />micro tunneling of approximately 3,000 feet of sewer across College Avenue and <br />Waring Road, which required permitting coordination with the California Department <br />of Transportation (Caltrans) and San Diego's Metropolitan Transit System. <br />Marine Park Irrigation Retrofit Project, Santa Monica, CA. * Keenan was the <br />Project Manager in charge of the planning and design of approximately 3,000 linear <br />feet of six-inch polyvinyl chloride (PVC) pipeline filled from a 2.75-Mgal treated storm <br />water reservoir located at the City of Los Angeles' Penmar Park and transferred to a <br />holding tanklcistern located at Marine Park. Project for City of Santa Monica. <br />Castaron Main Replacement —Cherry Avenue, Long Beach, CA. * For the Long <br />Beach Water Department, served as Project Manager and Technical Lead for a <br />12-inch cast-iron main replacement project. Responsibilities included the planning <br />and design forthe installation of approximately 2,600 linear feet of 12-inch ductile iron <br />pipe to replace cast-iron main pipes on Cherry Avenue. <br />Ethanol Plant, Madison County, IL. Keenan was the Project Engineer in charge <br />of the planning and design of final construction plans and details with regard to site <br />grading, drainage, and underground utilities for an 84-Mgal ethanol production facility <br />currently under construction on a 75-acre site in Madison County. <br />* Prior to joining Gannett Fleming. <br />City of Santa Ana <br />RFP for Space Planning and Architectural Consulting Service r� 3s r GRUENASSCCIATES <br />RFP No. 20-040 V V �3 V V .0.NCI IITLCTLFIL PLANNING NTLFIGT� Lah05GA'-- <br />