Laserfiche WebLink
DocuSign Envelope ID: 1BA90275-0048-437F-ACEC-13F73597F313 <br />N11$10 Vjto] AM4IONTA$MA <br />ABOUT SYSKA HENNESSY <br />At Syska Hennessy Group, we create exceptional <br />environments. We do this by focusing our <br />high performance engineering, consulting and <br />commissioning services on our clients' business <br />practices and challenges, creating projects that <br />position them for success. <br />Drawing on 90 years of engineering experience, <br />we have helped to shape the skyline in cities <br />around the world. Creating building systems in <br />some of the most iconic and technically -advanced <br />buildings has taught us to balance a truly global <br />perspective on best practices with a very clear <br />focus on our clients and their specific needs. <br />Key to our success is our ability to collaborate <br />and communicate with all project team members <br />Collaboration is a part of Syska's DNA and is <br />exhibited in the variety of delivery models we <br />embrace: traditional, design assist, design -build <br />and public private partnerships all bring us to the <br />table in creative and significant ways. <br />OUR SERVICES <br />As we engage with the entire project team, we <br />contribute technical depth and strategic design <br />understanding to deliver performance insights <br />and operational advantages. Our energy and <br />simulation modeling expertise allows us to <br />predict design implications and anticipate <br />opportunities and challenges across the entire <br />project lifecycle. Our Revit and BIM experience <br />allows us to collaborate in unique and powerful <br />ways with the owner, the design team and the <br />contractor. These tools are supported by <br />our can -do attitude, proactive approach, and <br />know-how acquired over years of practice. <br />Taken together, these skills, attitudes, and tools <br />support our clients' ability to make informed <br />decisions about their project, from inception, <br />through design and construction and into the <br />operational phase. <br />Architectural Vertical <br />Lighting Sustainability Transportation <br />EP <br />� o0 <br />y <br />ICT Fire and <br />(IT, Audiovisual, Life Safety <br />Security & BMS) <br />MEP Commissioning <br />g - —� <br />KEY FACTS <br />l9 87 <br />Founded <br />ozoo <br />"Olrlilamm�,& <br />500 <br />employees in <br />18,54,v,.A <br />locations worldwide <br />Locations <br />Atlanta, GA <br />Boston, MA <br />Charlotte, NC <br />Chicago, IL <br />Dallas, TX <br />Hamilton, NJ <br />Jacksonville, FL <br />Los Angeles, CA <br />New York, NY <br />Orange County, CA <br />Raleigh, NC <br />Richmond, VA <br />San Diego, CA <br />San Francisco, CA <br />Silicon Valley, CA <br />Washington, DC <br />Dubai, UAE <br />Shanghai, PRC <br />