this. <br />4.2.6. Vendor Meter installation/ retrofit process established and perfornied. See section <br />8.2. <br />4.2.7. Service Orders (design, build, test, deploy) The 3 actions from the MDMS solution <br />will be aligned with the work order(s) defined in the MDMS SOW. <br />4.2.8. Billing request and response files between MDMS and enQuesta (build, test, <br />deploy). <br />5. ENQUESTA CIS BUSINESS REQUIREMENTS <br />5.1. Auto -Void Reconnect <br />5.1.1. Analysis of current credit and collections business process and discussion with <br />The City to determine business requirements to turn on functionality in AMI stage 1. <br />This functionality auto voids an existing Turnoff workorder for non-payment if payment <br />is received prior to the enQuesta Link status of being completed. If completed the action <br />can be to create a Turn on work order as payment was received. This functionality can <br />work as part of AMI Stage I and will continue with AMI Stage 2 including sending the <br />Auto void before processed by the front end AMI solution or establishing a reconnect <br />and automatically sent to the front end AMI to be processed if the meter is coded as an <br />AMI meter with a Type — remote disconnect. <br />25H-109 Page 102 <br />