Laserfiche WebLink
To accomplish these task, Aqua -Metric will install the Basestations at the sites identified in <br />the Sensus propagation analysis. Aqua -Metric will provide any necessary site plans and <br />install each Basestation in accordance with the site plan requirements. Santa Ana will <br />designate any personnel necessary to oversee the installation of Basestations at each <br />collector site. <br />Once the Basestations have been installed and integrated with the RNI and MDM, Aqua - <br />Metric will contract and coordinate with Concord to deploy up to one hundred (100) water <br />meters and SmartPoint radio transceivers (the "Test Meters") at predetermined locations <br />within Santa Ana's service area. Aqua -Metric will assist Santa Ana through the execution <br />of Alpha POC testing to confirm all configurations and integrations have been established <br />accurately and update the meter and RNI configurations if necessary. <br />B. Acceptance Criterion <br />Aqua -Metric and Santa Ana have prepared and approved Basestation Site Plans. <br />ii. Aqua -Metric has installed all network Basestations in accordance with Santa Ana <br />requirements and relevant site plans. Aqua -Metric has installed and configured <br />communications backhaul devices at each site to establish a connection between each <br />Basestation and the RNI. <br />iii. Aqua -Metric and Sensus have configured the RNI to meet Santa Ana's specifications. <br />iv. Aqua -Metric has integrated NovusCenter Work Order Management Software <br />("WOMS") with the CIS and configured for meter and SmartPoint installations. Santa <br />Ana has access to the WOMS. <br />v. Aqua -Metric and Santa Ana have established a Customer Communications Plan to <br />notify Santa Ana customers of the ensuing meter exchange. <br />vi. Aqua -Metric and Santa Ana have resolved any outstanding meter installation scope <br />expectations, including Return to Utility ("RTU") definitions and exceptions, to serve <br />as guidelines throughout the Project. <br />vii. Concord has successfully installed the additional Test Meters with accurate <br />configurations and verified all Test Meters are transmitting data to the Basestation. <br />viii. Aqua -Metric, Sensus, S&S and Harris have completed the Systems Integration Testing <br />verifying successful integration between the RNI, MDM, WOMS, and CIS. <br />ix. Aqua -Metric, Sensus, S&S and Harris have satisfied the deliverables as outlined in <br />Exhibit A Prime Contractor SOW. <br />x. Santa Ana has executed the Acceptance Certificate or authorized Aqua -Metric to <br />proceed into the Beta POC Phase. <br />1.3. Beta POC Phase <br />A. Description <br />The Beta POC Phase will include an increase deployment of up to one thousand (1,000) Test <br />Meters to support Santa Ana System Acceptance Testing ("SAT"). Aqua -Metric will assist <br />Santa Ana in determining exact quantities and meter sizes needed for SAT. The intent of this <br />phase will be to ensure all network infrastructure and software are communicating <br />25H-129 Page 122 <br />