My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT FOR RIGHT OF WAY ON-CALL
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
12/15/2020
>
25D - AGMT FOR RIGHT OF WAY ON-CALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 4:44:09 PM
Creation date
12/10/2020 4:37:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
12/15/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GUIDA <br />:.:.: SURVEYING INC. <br />PROJECT EXPERIENCE <br />Project Manager, Engineering Capital Projects <br />Project Manager, Engineering Capital Projects <br />Irvine Ranch Water District <br />Irvine Ranch Water District <br />15600 Sand Canyon Avenue <br />15600 Sand Canyon Avenue <br />Irvine, CA 92518 <br />Irvine, CA92618 <br />(949)453.5542 <br />(949)453.5542 <br />mcghee@irwd.com <br />mcghee@i rwd.com <br />PROJECT FEE: <br />PROJECT DATES: <br />N/A <br />06/99 - Ongoing <br />South Coast Water District, Wastewater Tunnel Phases 2 and 3 <br />Laguna Beach, CA <br />South Coast Water District's (District) Tunnel Stabilization and Sewer <br />Pipeline Replacement Project proposes to stabilize and update the <br />existing 60-year-old, 2-mile tunnel beneath the bluff in South Laguna <br />Beach. The tunnel will be enlarged from an average of 5 to 7 feet with the <br />installation of a new 24-inchconcrete encased pipeline. <br />Guida is providing the District with land surveying and mapping services to <br />support the stabilization and pipeline replacement. The surveying services <br />began with the establishment and verification of horizontal and vertical <br />controls both on the exterior and interior of the tunnel. Guida was also tasked with verifying the tunnel <br />alignment at the beginning of construction. During construction, Guida provide terrestrial HDAR (laser <br />scanning) of the interior of the tunnel to verify the tunnel alignment and create an as built of the tunnel and <br />newly installed pipeline. Additionally, Guida provided laser scanning to monitor the bluffs and monitor any <br />movement of the bluffs during construction activities. <br />Guida is currently providing monitoring of Bay Drive on top of the bluffs. Control was established outside the <br />area of influence by construction to monitor any potential movement that may occur to the street and homes <br />along Bay Drive. The monitoring is being performed on a regular basis with reports delivered to the District <br />after each monitor visit. Finally, Guida is providing legal descriptions and plats for new tunnel easements to <br />support the widening and acquisition of additional land for the tunnel improvements. These legal descriptions <br />and plats are being prepared over the 150 affected parcels by phase 2 and 3 of the tunneling project. <br />ADDITIONAL INFORMATION: <br />REFERENCE: <br />CLIENT: <br />South Coast Water District <br />South Coast Water District <br />31592 West St. <br />Laguna Beach, CA 92651 <br />Joe Si nacori <br />949.499.4555 <br />JSinacori@scwd.org <br />PROJECT FEE: <br />PROJECT DATES: <br />$201,500 <br />2018-Ongoing <br />a <br />PROPOSALTO <br />CITY OF SANTA ANA. RFP z%: 25D-1 84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.