GUIDA
<br />MEMNON SURVEYING INC.
<br />Justin Height, PLS
<br />Project Manager
<br />About:
<br />Years of Experience: 34
<br />Education: B.S., Surveying and Photogrammetry,
<br />California State University, Fresno
<br />RESUME
<br />Years with Guidw 2
<br />Professional Registration/Certifications: Professional Land
<br />Surveyor ft6167/CA/1989; Professional Land Surveyor
<br />420712/NV/2010; Professional Land Surveyor
<br />#16900/ID/2016
<br />Summary:
<br />Justin has more than 33 years of land surveying and mapping surveying experience. As Project Manager and Project
<br />Surveyor, Justin provides client and project management, coordination of field and office personnel and resources,
<br />performance of field and office surveying, quality control and final deliverables. Justin performs right-of-way
<br />engineering, boundary surveys and mapping, ALTA Surveys, obtaining and reviewing Preliminary Title Reports,
<br />cadastral and title research, plotting existing encumbrances, dedications and vacations, preparation of legal
<br />descriptions and plats, records of Survey, parcel maps, tract maps, lot -line adjustments, other land surveying
<br />services.
<br />Project Experience:
<br />City of Fontana, Foothill Boulevard Malaga Bridge, City of Fontana, CA: Justin serves as project surveyor for
<br />this project with the City of Fontana to modify and improve the Malaga Bridge. As part of the design
<br />engineering team, Guida is leading the surveying and mapping services to support the project. Guida is
<br />providing horizontal and vertical control surveys, aerial mapping, topographic design surveys with
<br />conventional ground survey and terrestrial HDAR methods, utility pothole surveys, right-of-way research,
<br />preliminary title reports, preliminary land net map, Final right of way requirements, a final land net map, and
<br />legal descriptions.
<br />Caltrans District 8, Contract No. No. 08A2871, On -Cell Right of Way Engineering Support Services, San
<br />Bernardino, CA: Justin serves as task order lead for Guida's on -call with Caltrans District 8. Projects under this
<br />contract are of varying scope and size and include roadway rehabilitation, widening and/or realignment of
<br />existing facilities, relocation of existing facilities, and construction of new facilities. Guida's scope of work
<br />includes: right of waystudies, cadastral/title research, land net surveys and mapping, right of way maps,
<br />appraisal maps, acquisition documents/deeds, resolutions of necessity, directors deeds, other deed
<br />documents, flag/stake right of way, monument preservation and perpetuation, right of way monumentation
<br />surveys, records of survey, trial exhibits, expert witness testimony, relinquishment and vacation maps, excess
<br />land deeds and maps, and right of way record maps_ All services underthis contract are at the direction of the
<br />Caltrans Contract Manager and Caltrans Task Order Manager and will be prepared in accordance with the
<br />Caltrans Survey and Right of Way manuals as well as the latest release of the Caltrans CAD manuals and
<br />templates.
<br />City of Lake Elsinore, Temescal Canyon Bridge over Temescal Wash Replacement Project PS&E, Lake
<br />Elsinore, CA: Justin serves as project surveyor for Guida's contract to provide surveying and topographic
<br />mapping services for the final design phase for a new 4-lane, 98-foot-wide, 373-foot-long bridge at the new
<br />alignment, along the realigned portion of existing Temescal Canyon Road. Guida's scope of work includes
<br />performing topographic surveys and providing cross -sections every 100 feet in the channel that covers the
<br />go
<br />PROPOSALTO
<br />CITY OF SANTA ANA, RFP 2C-
<br />25D-187
<br />74
<br />
|