Laserfiche WebLink
1"" GUIDA <br />a»3AJ <br />mum::: SURVEYING INC. <br />(MTLS) data using Trimble Business Center, PosPac, RiPROCESS, MicroStation, TopoDOT, and AutoCAD C1vi13D. <br />She prepared and delivered DTM surfaces for roadway design, performed research and boundary analysis for <br />transportation survey projects, developed land net mapping, applied surveying principles in accordance with <br />the California Professional Land Surveyors Act, revised and updated right of way mapping as design changes <br />occurred, and maintained and updated right of way mapping server database in Google Earth. <br />City of Palm Desert, San Pablo Avenue Streetscape Improvement, Phase 2, Palm Desert, CA: Maria served as <br />project surveyor for Guida's design surveying services in support of Phase 2 of the San Pablo Avenue <br />Streetscape Improvement project in Palm Desert. San Pablo's second phase improvements are focused on the <br />roadway between Fred Waring and Magnesia Falls Drive and include widened sidewalks, bike lanes, on -street <br />parking, enhanced pedestrian crosswalks and lighting, landscaping, drainage and pavement improvements, <br />improved utilities, and additional roundabouts at San Pablo and Magnesia Falls Drive and at San Pablo and the <br />College of the Desert entrance. Guida's scope of work included establishing control, collecting spot elevations, <br />plotting the right of way roadway and property lines, and preparing legal descriptions and plats to accompany <br />easement documents. <br />Riverside County Transportation Commission, SR-91/1-15 Express Lanes Connector, Riverside, CA: Maria <br />serves as project surveyor for the SR-91/1-15 Express Lanes Connector; a ROTC project in conjunction with <br />Caltrans that links the 1-15 Express Lanes to the SR-91 Express Lanes. Guida is currently providing the design - <br />build team with control and surveying services to support the design of the connector and other <br />improvements. This includes mobile DDAR and terrestrial LiDAR surveys, topographic and utility surveys, and <br />some right of way engineering to support easements within the railroad and flood control right of way. Guida <br />will also be providing the design buildteamwith construction staking once the construction phase begins. <br />Construction is planned to begin in 2021 with the connector opening by 2023. <br />RESUME <br />City of Fremont, Sebercat Bicycle/Pedestrian Bridge Project, Fremont, CA: Maria is currently serving as project <br />manager for this project to provide a safe pedestrian and bicycle connection over 1-680 from Ohlone College to <br />the future Irvington KART station. In addition to the bridge structure, project features include new and <br />improved trails, a pedestrian undercrossing of the UPRR/BART corridor, various road improvements, <br />preparation for a future paleontological museum with associated parking area. Guida is providing surveying and <br />mapping services including aerial mapping and imagery, design topographic surveys, land net surveys and right <br />of way engineering, project control survey, map review submittal to Caltrans District 4, and preliminary land <br />net surveys and research. <br />Port of Los Angeles, SR-47 Improvement Project, Los Angeles, CA: Mariaserved as project surveyor for the <br />design surveys for the SR-47 improvement project. The Port of Los Angeles is proposing to widen and improve <br />the intersection of the SR-47 and Harbor Boulevard within the port limits. As part of the design engineering <br />team, Guida provided LiDAR surveying services to support the development of PS&E. Guida provided horizontal <br />and vertical control surveys tied to the Caltrans District 7 primary controls, LiDAR surveys over the project limits <br />for the SR-47, on and off ramps, and secondary roads, supplemental topographic design surveysfor utilities and <br />quality control, developing a seamless point cloud model and topographic mappin <br />00 <br />PRO POSAL TO <br />CITY OF SANTA ANA, RFP 20- <br />25D-190 <br />77 <br />