Mike Flanagan, SR/WA, R/W-NAC
<br />Role: Project Manager
<br />Project Manager, Rainbow Municipal Water District, As -Needed General Real Property Services, Fallbrook, CA:
<br />Mike manages this project to provide as -needed right-of-way, land management and encroachment resolution
<br />services to the water district. The projects include coordination with Metropolitan Water District for negotiation of
<br />property rights/permitting and boundary surveys for determining easement rights. Other services provided include
<br />encroachment resolution, partial acquisitions for subterranean easements and coordination with local and state
<br />agencies for utility relocation.
<br />Senior Right of Way Agent, Mountain Meadow Road Improvement Project, County of San Diego, CA: The
<br />Mountain Meadow Road Improvement Project widened Mountain Meadow Road from two -lanes to four -lanes
<br />beginning at the exit of Interstate-15 two miles east to the Hidden Meadows neighborhood, 31 of the 33 required
<br />parcels were acquired through negotiation. Eminent Domain suits were filed against two of the property owners,
<br />however, those acquisitions were later settled through continued negotiation. The most challenging aspect of this
<br />project was completing the acquisition of easements, which would bring the traveled lane, in some cases, within 12-
<br />feet of the owner's residence.
<br />Senior Right of Way Agent, San Diego County Water Authority, Carlsbad Desalination Project, San Diego, CA: The
<br />Carlsbad Desalination Plant was constructed adjacent to the ocean at South Carlsbad Beach, ten miles from the
<br />aqueduct system. Mike used his acquisition skills to purchase approximately 15 easements for the pipeline
<br />connecting the 2-acre Connection Facilities site to the Plant. The greatest project challenge was acquiring the
<br />Connection Facilities parcel from an owner who possessed an approved development plan.
<br />Senior Right of Way Agent, San Diego County Water Authority, Pipeline 3 Reline Project, San Diego County, CA:
<br />The project proposed to reinforce Aqueduct Pipeline 3 through which desalinated water would be pumped from the
<br />Connection Facility to the Twin Oaks Treatment Plant. The project required 16 temporary easements at
<br />approximately .5-mile increments, where contractors could excavate 100 feet of large -diameter pipe, insert new
<br />steel liners, then reinstall the 100-foot section that had been removed. The greatest project challenge was working
<br />with the Movement Church and City of San Marcos to construct a temporary parking lot to replace the permanent
<br />parking area which was excavated for pipe removal.
<br />Senior Right of Way Agent, San Diego County Water Authority, San Vicente Dam Raise Project, San Diego, CA: The
<br />San Vicente Dam Suite of projects included acquisition of pipeline easements for the 11-mile, large diameter San
<br />Vicente tunnel to a connection point with the SDCWA aqueduct. Adjacent to Interstate 15, acquisition of land for
<br />the SV Surge Tank and Pump Station facilities, acquisition of approximately 425 acres, from 17 property owners (all
<br />at appraised value) for additional buffer surrounding the SV Reservoir, acquisition of temporary property rights from
<br />the City of San Diego (the dam and reservoir remain property of the City of SD) for construction of the 117-foot
<br />height increase to the dam structure. The greatest project challenge was working through the City Council approval
<br />process.
<br />Senior Right of Way Agent, San Diego County Water Authority, Mission Trails Pipeline and Tunnel Project, San
<br />Diego, CA: As a Senior Right of Way Agent Mike acquired property located in Mission Trails Regional Park from City
<br />of San Diego and San Diego Unified School District for construction of a 5-mile pipeline and 12-million-gallon Flow
<br />Regulatory Structure. Challenges included working through School District approval process for acquisition.
<br />Senior Right of Way Agent, San Diego Gas & Electric (SDG&E), Fire Risk Mitigation (FIRM) Project, San Diego, CA:
<br />Mike acquired new easements and amended existing easements for SDG&E's electric distribution pole replacement
<br />project. To increase safety in high fire prone areas, SDG&E has embarked on a multi -year project of assessing the
<br />safety and technical effectiveness of over 180,000 electrical distribution poles in their territory. Clark Land is
<br />supporting this multi -faceted and complex program by managing the land activities for SDG&E.
<br />Appendix Page 10 of 34 1 Clark Land Resources, Inc. (WBE/SB)
<br />
|