Laserfiche WebLink
EXHIBIT C <br />QUANTITIES FOR FEE SCHEDULE (UNDER SEPARATE COVER) <br />For the purposes of providing a Fee Schedule based on the below Sample Task Orders, the following work <br />items and quantities are provided. The Fee Schedule in Attachment 5: <br />Each Fee Schedule shall include a schedule of the hourly billing rates for ALL contractor and subcontractor <br />staff and labor personnel. Additionally, for each discipline that a company seeks to be considered, the below <br />table(s) shall be completed. For example, if a General Contractor is submitting for Asphalt Concrete and <br />Concrete Work, Sample Task Orders A and B would both be required to be completed as part of the Fee <br />Schedule. Each table shall include the filling in of the last two columns for the relevant sample task orders <br />for whichever category(ies) are being submitted for consideration. However, actual work will be paid for as <br />described in Section I.A. "Nature of Work." Sample Task Orders for Asphalt Concrete and Concrete <br />roadway and sidewalk and Stormdrain public right-of-way related work are, respectively: <br />Sample Task Order A - Asphalt Concrete <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />1 <br />Unclassified Excavation <br />550 <br />Cy <br />0 6O. O O <br />4V. go O <br />2 <br />AC Pavement <br />130 <br />TN <br />-f f0. 0 0 <br />4 ) ( 7 0'0 <br />3 <br />Furnish and Install 46 Pullbox <br />4 <br />EA <br />$ 500. 0014cl00 <br />O4 <br />Ad'ust Manhole to Finished Grade <br />5 <br />EA <br />950.0 0 <br />S05 <br />PCC Curb and Gutter a A-2-8 <br />100 <br />LF <br />� 170. 0 a <br />0a- <br />6Si <br />in and Sari in <br />1 <br />LS <br />ai o 0 J <br />0'07 <br />Traffic Control Work <br />1 <br />LS <br />,? So -0 <br />O 0 <br />Sample Task Order B - Concrete Paving <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />1 <br />Unclassified Excavation <br />550 <br />CY <br />S'O.O- <br />;? % 50-a <br />2 <br />PCC Sidewalk T=4" <br />2,500 <br />SF <br />I a.O O <br />-00 00 0 <br />3 <br />PCC Curb Ramp <br />3,000 <br />SF <br />is o 0 <br />YSOO o <br />4 <br />PCC Curb and Gutter (Type A-2-8 <br />Inn <br />LF <br />qQ, p aI <br />q,L 0 0 <br />5 <br />Furnish and Install #6 Pullbox <br />4rEA <br />$ 500. 00 <br />9 0 0 0 <br />6 <br />Adjust Manhole to Finished Grade <br />5$ <br />S0. 0 0 <br />52 <br />7 <br />Catch BasinT e "B;' W=10' <br />1l <br />rooO <br />.$lT00J8 <br />Remove and Re lace 30" Reinforced Concrete Pie <br />75 <br />250. o O <br />$ $ 75-0 <br />9 <br />Guard Rail Re lacement Caltmns RSP A77N4 <br />50jl/op.OD <br />'S 00.010 <br />Guard Rail Re lacement Termination Caltrans <br />1t�+ <br />000.00 <br />00-O <br />1 I <br />Remove andRe lace Chain Link R/W Fence <br />50 <br />$ 75.00 <br />7 y-012 <br />Concrete Barrier T e 836 Caltrans <br />50 <br />0 ° O <br />$ 0 00 p <br />13 <br />Traffic Control Work <br />1 <br />LS <br />City of Santa Ana RFP 20-106 <br />Page Al-2 <br />