NINVAUS WEMCAMIZ <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 17-9001 South Main Street Corridor Improvements Change Order Number 2 <br />To C.S Legacy Construction Inc. Contractor <br />You are hereby directed to make the hei sin changes from the plans and specifications or do the following described work not included In the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCILOR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE UNIT PRICE <br />5. Bus shelter has been revised from the original design to incorporate historic South Main art. <br />(PCO #10) <br />TOTAL AGREED PRICE = $23,384.00 <br />B. Installation of a push button due to meet ADA standards and the existing conditions. (PCO <br />#11) <br />TOTAL AGREED PRICE = $4,962.87 <br />7. The condition of the existing street light conduit system required additional field <br />investigation to determine the usability of the conduit or the replacement of the conduit to <br />complete the street light scope of work. The electrical contractor performed exploratory <br />TOTAL AGREED PRICE = $14,375.41 <br />EXTRA CONTRACT TIME <br />*Time extension to be deferred until all extra work is completed and critical path impacts are <br />known. <br />TOTAL CHANGE ORDER AMOUNT = $195,729.86 <br />Page 2 of 3 <br />