Laserfiche WebLink
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Proiect No. 17-9001 South Main Street Corridor Improvements Change Order Number 1 <br />To C.S. Legacy Construction, Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following desodbed work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY Cnl1NCn na crTvueuecco <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. I <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED UNIT PRICE <br />Change Order 01— Line Item <br />quantity <br />Unit <br />Unit Price <br />8" Class 305 C900 <br />4,300.00 <br />LF <br />255.00 <br />12" Class 305 C900 <br />630.00 <br />LF <br />350.00 <br />1369,600.00 <br />3: New FH Assembly <br />16.00 <br />EA <br />13,000.00 <br />1" Water Service <br />88.00 <br />EA <br />4,200.00 <br />2"Water Service <br />17.00 <br />EA <br />6,500.00 <br />110,500.00 <br />8" Gate Valve <br />25.00 <br />EA <br />4,200.00 <br />105,000.00 <br />12" Gate Valve <br />1.00 <br />EA <br />6,600.00 <br />6,600.00 <br />4" Fire Service <br />2.00 <br />EA <br />11,500.00 <br />23,000.00 <br />6" Fire Service <br />3.00 <br />EA <br />13,000.00 <br />39, 000.00 <br />8" Fire Service <br />1.00 <br />EA <br />18,000.00 <br />18,000.00 <br />Connect Proposed to Existing Gate Valve <br />1.00 <br />EA <br />6,000.00 <br />6,000.00 <br />Abandon Gate Valve <br />38.00 <br />EA <br />500.00 <br />19,000.00 <br />HMA Pavement <br />2,550.00 <br />TON <br />200,001 <br />510,000.00 <br />Traffic Control <br />1.00 <br />LS <br />200,000.00 <br />200,000.00 <br />As-Builts <br />1.00 <br />LS <br />1,000.00 <br />1,000.00 <br />1" Air Vac (As -Needed) <br />5.00 <br />EA <br />8,000.00 <br />40,000.00 <br />Additional Trenching 18"-30" Deeper (As - <br />Needed) <br />500.00 <br />LF <br />75.00 <br />37,500.00 <br />Potholing (As -Needed) <br />10.00 <br />EA <br />1,500.00 <br />15,000.00 <br />Vertical Offset (As -Needed) <br />5.00 <br />EA <br />10,000.00 <br />50.000.00 <br />Saddleback Survey <br />1.00 <br />LS <br />17,900.00 <br />17,900.00 <br />Page 1 of 3 <br />