Laserfiche WebLink
Project 17-9001 <br />Change Order No, 1 <br />Page 2 of 3 <br />12" Gate Valve <br />1.00 <br />EA <br />6,600.00 <br />6,600.00 <br />4" Fire Service <br />2.00 <br />EA <br />11 500.00 <br />23 000.00 <br />6" Fire Service <br />3.00 <br />EA <br />13,000.00 <br />39 000.00 <br />8" Fire Service <br />1.00 <br />EA <br />18 000.00 <br />18,000.00 <br />Connect Pro osed to Existing Gate Valve <br />1.00 <br />EA <br />6.000.00 <br />6,000.00 <br />Abandon Gate Valve <br />38.00 <br />EA <br />500.00 <br />19,000.00 <br />HMA Pavement <br />2,550,00 <br />TON <br />200.00 <br />510 000,00 <br />Traffic Control <br />1.00 <br />LS <br />200,000.00 <br />200.000.00 <br />As-Builts <br />1.00 <br />LS <br />1000.00 <br />1,000.00 <br />1"Air Vac As -Needed <br />5,00 <br />EA <br />8,000.00 <br />40,000.00 <br />Additional Trenching 18"-30" Deeper (As - <br />Needed) <br />500.00 <br />LF <br />75.00 <br />37,500,00 <br />Potholing As -Needed <br />10.00 <br />EA <br />1,500.00 <br />15 000.00 <br />Vertical Offset As -Needed <br />5.00 <br />EA <br />10 000.00 <br />50,000.00 <br />Saddleback Survey <br />1.00 <br />LS <br />17,900.00 <br />17,900.00 <br />Bond <br />1.00 <br />LS <br />30,752,00 <br />30,752.00 <br />Concrete Washouts <br />7.00 <br />EA <br />750.00 <br />5,250.00 <br />Temporary Facilities <br />3.00 <br />MO <br />1,500.00 <br />4,500.00 <br />Labor: Superintendent <br />704.00 <br />HR <br />91.26 <br />64,248.43 <br />Labor: Project Manager /Enineer <br />704.00 <br />HR <br />75.75 <br />53,328.00 <br />Labor: SWPPP Maintenance <br />132.00 <br />HR <br />69.34 <br />9 153.02 <br />Labor: Pedestrian Control <br />264.00 <br />HR <br />69.34 <br />18,306.03 <br />Equipment: PickR for Pedestrian. Control <br />264.00 <br />HR <br />25.14 <br />6,636,96 <br />Equipment: Pickup for SWPPP Maintenance <br />132.00 <br />HR <br />25.14 <br />3,318.48 <br />Eq uIpment Pickup <br />704.00 <br />HR <br />25.14 <br />17 698.56 <br />Supplemental Equipment: Misc Asphalt <br />/Traffic Control <br />1.00 <br />LS <br />10 000.00 <br />10,000.00 <br />Supplemental Equipment: Sweeper <br />1.00 <br />LS <br />16 000.00 <br />16.00p.00 <br />Subcontractor Mana ement <br />1.00 . <br />LS <br />2231003.71 <br />223 003.71 <br />Supplemental Markus <br />1.00 <br />LS <br />4,199.00 <br />4,199,00 <br />TOTAL <br />3,559,494.20 <br />