Laserfiche WebLink
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 15-2645 Santiago Park Gas House Area Improvements Change Order Number <br />To Nationwide General Construction Services Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE UNIT PRICE <br />1. To compensate contractor for additional Water Pipe. (PCO #1) <br />TOTAL AGREED PRICE = $4,599.00 <br />2. Provide survey to have reverse flow for the sewer system from the Restroom Building to the <br />Gas House to the manhole. (PCO #2) <br />TOTAL AGREED PRICE = $2,975.00 <br />3. Per the response of R17I-09, per the direction of the City of Santa Ana, remove the <br />remaining 2' of the concrete slab in the gas house, excavate 12" all the inside of the <br />perimeter of the exterior walls, epoxy dowels into the footing, place the rebar of the new <br />footing and pour the concrete footing. (PCO #4) <br />TOTAL AGREED PRICE = $8,127.76 <br />4. Provide additional sewer survey to have reverse flow for the sewer system from the <br />Restroom Building to the Gas House to the manhole. (PCO #5) <br />TOTAL AGREED PRICE = $2,975.00 <br />5. Per the request of the City of Santa Ana, connect existing sewer at the cabin house to the <br />Gas House to the exiting manhole and connect the sewer from the restroom building to new <br />sewer line. Give credit to sewer line from the restroom building to the Gas House as <br />outlined in the original utility plan. (PCO #6) <br />TOTAL AGREED PRICE = $46,050.17 <br />6. Per the request of the City of Santa Ana, Provide and install an additional conduit for future <br />use for surveillance system. The proposed new conduit to be installed in the same trench <br />alongside with the lighting conduit. (PCO #7) <br />TOTAL AGREED PRICE = $18,562.33 <br />7. Per the request of the City of Santa Ana, per the new revised plans, changes were made to <br />the Gas House and to the site work. (PCO #8) <br />TOTAL AGREED PRICE = $82,748.71 <br />Page 1 of 3 <br />