Laserfiche WebLink
Cny o1 Sxn1a Ana <br />SOMis,Pail, .Ono Hooso Arno DavelWOOnt(153d451. bldd,.r oil 12110,2020200 PM IVSn MOM 0112112021 <br />Line Items <br />Item 9 <br />Item Description <br />UOM <br />CITY <br />Unit Price <br />Line Total Comment <br />Base Bid Items <br />$2,128,41860 <br />1 <br />Clearing and <br />Grubbing <br />LS <br />1 <br />$48,000.00 <br />$48,000.00 <br />2 <br />Site Demolition <br />LS <br />1 <br />$120,000.00 <br />$120,000.00 <br />3 <br />Unclassified <br />Excavation' <br />Cy <br />4800 <br />$60.00 <br />$288,000.00 <br />4 <br />Grading <br />LS <br />1 <br />$120,000.00 <br />$120,000.00 <br />5 <br />New Water <br />Service <br />LS <br />1 <br />$120,000.00 <br />$120,000.00 <br />6 <br />Electrical Service <br />& Lighting <br />LS <br />1 <br />$216,000.00 <br />$216,000.00 <br />7 <br />Site Drainage <br />LS <br />1 <br />$96.000.00 <br />$96,000.00 <br />6 <br />Rostroom Building <br />Improvements <br />LS <br />1 <br />$90,000.00 <br />$90,000.00 <br />Gas House <br />9 <br />Building <br />LS <br />1 <br />$90.000.00 <br />$90,000.00 <br />Improvements <br />10 <br />Double Swing <br />Tuba Steel G <br />EA <br />2 <br />$10.800.00 <br />$21,600.00 <br />11 <br />Tube Steel <br />Fencing" <br />LF <br />170 <br />$504.00 <br />$86,680.00 <br />12 <br />4" Concrete <br />Flalwork' <br />LF <br />2945 <br />$16.80 <br />$49,478.00 <br />13 <br />6"Concrete <br />Flelwork' <br />SF <br />0360 <br />$19.20 <br />$179,712.00 <br />Decomposed <br />14 <br />Granite Paving <br />with Integral <br />SF <br />4830 <br />$1.92 <br />$9,273.60 <br />Binder' <br />15 <br />Shovel Cut Edge" <br />LF <br />3200 <br />$1.80 <br />$6,760.00 <br />16 <br />Concrete Header' <br />LF <br />1295 <br />$48.00 <br />$62,160.00 <br />17 <br />Park Entry <br />Gateway <br />LS <br />1 <br />$30,000.00 <br />$30.000.00 <br />18 <br />Stair Case 'A" <br />LS <br />1 <br />$13,200.00 <br />$13,200.00 <br />19 <br />Outdoor <br />Performance Area <br />LS <br />1 <br />$60,000.00 <br />$60.000.00 <br />20 <br />Bollards <br />EA <br />3 <br />$600.00 <br />$1,800.00 <br />21 <br />Rock Cobble <br />Edging' <br />LF <br />320 <br />$60.00 <br />$19,200.00 <br />22 <br />Stacked Rock <br />Walls <br />LS <br />1 <br />$48,000.00 <br />$48,000.00 <br />23 <br />Boulder <br />Placement <br />EA <br />26. <br />$120.00 <br />$3,120.00 <br />24 <br />Benches <br />EA <br />14 <br />$1,200.00 <br />$16,800.00 <br />� PIan21fT"`+. nm <br />