Laserfiche WebLink
Exhibit 13-1 to I st Arriendnient <br />Section 5 - Rate and Service Structure - items a) <br />through i) are priced per the Attachments 1, <br />Scope of Work of the RFP 18-060 <br />Tota� <br />a) Board up cost ist standard window <br />. . ............ - <br />9 0-.1-2 <br />(1) each additional window thereafter <br />$167 97 <br />.............. <br />$190.1 <br />1 (1) �each additional door thereafter <br />$16T9 <br />C) board up cost of a garage - our pricing assumes <br />a single car garage (8' wide by Ttall) roll up door <br />and windows <br />e) Chain and lock fee (3' of 5/16 galvanized chain <br />nd one combination lock) <br />f) weed, abatement service: includes mow, hand <br />weed, abatement, blow off sidewalks, e ging and <br />handwork of perimeter, disposal etc (p arily <br />neglected residental property) per hou rate <br />f weed .bat�r' e'nt service: includes mow, hand <br />weed, abatement, blow off sidewalks, edging and <br />handwork of perimeter, disposal etc (primarily <br />neglected residental property) flat rate per <br />of parcel. Minimum charge of $128.00 per <br />parcel/lot <br />g) Debris removal service: cost per ton, I ncudes <br />clean-up debris by hand, disposal (no heavy <br />equipment) <br />$508.29 <br />h) Travel Charge per hour <br />..... . ..... . . ...... ......... <br />$148.12 <br />1) After hour charge per hour <br />City Council 23-6 3/16/2021 <br />