My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-03-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/16/2021 Regular
>
FULL AGENDA PACKET_2021-03-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 11:27:07 AM
Creation date
7/8/2021 4:07:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
3/16/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
725
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PLAN IMPLEMENTATION AND ACTION: <br />The following highlights the programs and actions that occurred within this 2020 reporting <br />period of January thorough December 2020, to implement the City of Santa Ana General <br />Plan goals and policies: <br />1. Airport Land Use Environs Element (2008) <br />This element serves as a long—range guide to safeguard the general welfare of the <br />inhabitants with the City of Santa Ana near the John Wayne Airport (JWA). <br />• In 2020, the Uniform Building Code was applied to all new residential development <br />which requires the structures to be designed to sufficiently mitigate so as to not <br />exceed an interior noise standard of 45 dB(A) CNEL. <br />Federal Aviation Administration (FAA) and Airport Land Use Commission (ALUC) <br />regulations require major new development, general plan amendment and zone <br />changes within the height restriction zone for JWA to be evaluated. In 2020, ALUC <br />reviewed two projects included the pending comprehensive Draft General Plan <br />Update (submitted 10/15/20) and The Bowery Development Project (submitted <br />5/21 /2020). <br />There are four registered private heliports serving the City of Santa Ana. These <br />are located at the Brad Gates Building in Downtown Santa Ana, OC Global Medical <br />Center at 17th Street and Tustin Avenue, the So Cal Edison site near McFadden <br />Avenue, and Freeway Honda off McFadden Avenue and the 55 Freeway. These <br />heliports are consistent with FAA regulations and designed to minimize their <br />impacts on the surrounding community. <br />2. Circulation Element <br />This element is concerned with accommodating the transportation needs of those <br />living, working and visiting the City. It articulates the vision for the ongoing <br />development and maintenance of a comprehensive transportation network to <br />efficiently move people and goods throughout Santa Ana and the surrounding region. <br />The Environmental Transportation Advisory Committee (ETAC) is tasked with <br />providing Public Work Agency staff and City Council recommendation on matters <br />related to the public right-of-way and transportation programs. Due to challenges <br />brought on by the COVID-19 pandemic, ETAC convened only in January, February <br />and March of 2020; and anticipated to resume their meeting schedule in early <br />2021. <br />In 2020, $8.3 million were expended to reconstruct approximately 13.2 miles of <br />local streets and 1.7 miles of arterial streets. The City continued to implement two <br />community based planning efforts to improve walk -ability and bike -ability in the <br />City. The Active Transportation Plan, approved in June 2019, evaluated citywide <br />City Council 31 — 6 3/16/2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.