My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-05-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
05/04/2021 Regular
>
FULL AGENDA PACKET_2021-05-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 9:56:34 AM
Creation date
7/8/2021 4:40:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/4/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
544
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br />Description <br />Project involves replacement of existing damaged concrete sidewalks <br />in residential neighborhoods and will include the removal and <br />replacement of adjacent damaged concrete curbs, gutter and <br />driveways. Project will focus on areas with the highest concentration <br />of needed repairs, to help mitigate trip and fall hazards and reducing <br />potential of liability claims and assist in complying with regulations sct <br />forth by the American with Disabilities Act. <br />After the sidewalk concrete repairs within the public right of way are <br />completed, the public will have enhanced pedestrian and multi -modal <br />mobility through the improved neighborhoods. For at least 50% of <br />Santa Ana's low-income population, bicycle is the primary mode <br />of transportation. Therefore, properly maintaining the residential <br />sidewalks that currently have no other viable revenue source, is a <br />direct service <br />Target Date <br />6/30/2022 <br />Estimate the number <br />2.000 <br />and type of families <br />that will benefit from <br />the proposed activities <br />Location Description <br />Activities will occur in CDBG eligible areas as described in the <br />Description <br />Planned Activities <br />See description <br />6 <br />Project Name <br />CDBG Park Improvements <br />Target Area <br />n/a — The City does not use target areas for CPD funding <br />Goals Supported <br />Public Facilities and Infrastructure <br />Needs Addressed <br />Improve City public facilities and infrastructure <br />Funding <br />CDBG: $600,000 <br />Description <br />Conduct improvements to Santa Anita Park to ensure it continues to <br />adequately meet the needs of Santa Ana residents. <br />Target Date <br />6/3012022 <br />City Council 22 — 58 5/4/2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.