My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-05-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
05/18/2021 Regular
>
FULL AGENDA PACKET_2021-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2021 3:30:11 PM
Creation date
7/8/2021 4:52:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/18/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
932
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1 STATEMENT OF QUALIFICATIONS <br />t r <br />S ,if, of ,I , (.i l I(f I � SI �I F l i Il. � ol, <br />Hunsaker & Associates Irvine, Inc. (H&A), established in 1976, is a California <br />Corporation. Our company is a full -service civil engineering firm with <br />headquarters in Irvine and affiliated branch offices in Los Angeles, Riverside <br />and San Diego. Our services will be performed out of our Irvine headquarters. <br />H&A has a staff of over 300 professional engineers, surveyors, planners, <br />surveyors, administrative and support personnel. Our strength lies in the <br />company's experience and versatility. <br />H&A has carefully selected the core staff for this project from our in-house <br />personnel augmented by experts from several subconsultants. <br />NUVIS <br />izi P No >rl-ivy <br />;nfiagn P ash M aizi ll� , f f.ullan�: fb..iy�n <br />• Highly capable PM 45 years of <br />experience and City knowledge <br />• Same core team that had past <br />success for numerous cities for <br />infrastructure upgrade projects <br />• Highly responsive team with strong <br />working relationships from past and <br />present projects <br />• All necessary capabilities provided by <br />exceptional firms selected for this <br />assignment <br />The firm has been in existence almost 50 years creating outdoor design solutions from its headquarters in Orange County <br />and branch offices in Los Angeles, the Bay Area and Las. Vegas. The NUVIS team of 20 passionate and dedicated design <br />professionals work closely with public agencies, developers and communities to provide customer driven solutions <br />through hands-on collaborative workshops and design charrette facilitation. <br />tl,raa (V la, <br />Ptu IrtAA: w fk6lpVa,t4i l if, r*vl.,cd lit a,JJ✓ ml `tiy'nctt f c anefigavtlaTai89,I B/ffrrB an(I duck,; aelf f q'Yw iP?.^,Waa hpa it.p? rvr6wufla'tcbd,).. <br />ORSA Engineering <br />ORSA was established in 1986 and specialize in Utility Relocation, Underground and lighting design, photometric studies, <br />and have provided engineering and design services to many Cities, Transportation agencies and Utility companies <br />including City of Anaheim Electrical Engineering Division, SCE, LADWP, Burbank Water and Power and OCTA. <br />Leighton Consulting <br />Leighton has a wide range of skills on public and private sector projects including utility lines, educational and municipal <br />buildings, roadways and transportation related structures, public infrastructure facilities, pavement rehabilitation, <br />commercial and industrial facilities and structures projects. These have included park facilities, underground utilities, <br />public parking structures and building, and traffic signals projects for cities all over the southern California. <br />On the following page is the Organization Chart. A Staff Qualifications Matrix (11 x 17 placed at end of proposal) is <br />provided with a list of our team members, their experience, education, registrations and capabilities to perform the services <br />required by the RfP. One page resumes have been included in the appendix for additional information. Revised to <br />eliminate structural engineering firm from team since cantilevered viewing decks and pedestrian bridge eliminated. <br />City Council 16 — 20 5/18/2021 <br />nUNNAMR& 1N0(1AfINfRVJNE.INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.