My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-05-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
05/18/2021 Regular
>
FULL AGENDA PACKET_2021-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2021 3:30:11 PM
Creation date
7/8/2021 4:52:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/18/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
932
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL EXHIBIT 3 <br />PROJECT NO. 20-7530 <br />JEROME PARK BALUFIELD LIGHTING (WEST FIELD) <br />BID PROPOSAI, <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Servitek Electric, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or hnnp sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />New Spot%sLuling System <br />I <br />l-S <br />�'361,000.00 <br />$ 361,000.00 <br />2 <br />F umish and Install New NhMA 312 Cabinet <br />1 <br />I'S <br />5 15,000.00 <br />15,000.00 <br />.. <br />3 <br />........ <br />Construct Concrete Footing and Install City <br />6 <br />EA <br />x <br />a,950.00 <br />29,700A0 <br />P'urLn nishediglPole(WalkwayLighting) <br /><1 <br />Fumish and Install Wiring (2 #10 rued I #i6 <br />1,200 <br />LP <br />$ <br />GND) (Walkway I,ighung) <br />3.00 <br />3.600.00 <br />_.. <br />5 <br />Furnish and Install Wiring (-I #I) (from NFMA <br />1,000 <br />I-F <br />5.00 <br />5.000.00 <br />3R to Concession Stand) <br />G <br />Furnish and Install Wiring (I fig GNll) (lion, <br />250 <br />Lk <br />S <br />NIMA 3R to Concession Stand) <br />_. <br />....... <br />3.00 <br />.. <br />750.00 <br />......... ....... <br />7 <br />__ _.... <br />As -limit Plans <br />I <br />LS <br />S 4,800-00 <br />S 4,800.00 <br />.. <br />8 <br />..__. ........_ <br />Corstntction Peimit <br />1 <br />I S <br />....... <br />$ 10,000 <br />... <br />10,1100.00 <br />9 <br />Ptnject Advertisement Sign <br />I <br />FA <br />S 1,500.00 <br />$ <br />.500.00 <br />TOTAL SASE BID (Items '1 to 9) <br />s 431,350.00 <br />ADD ALTERNATE BID <br />Item <br />Description <br />Amount <br />10 <br />2" PVC Sc11- ule 40 Conduit <br />toff24-00 <br />6,000.00 <br />1 I <br />Grade Mound to 1 lu lhwith SoceejfT.ld Ad9,600-00 <br />Sprinkler Heads, and Seed ove Utaded Area <br />City Council 11 — 15 5/18/2021 <br />P-1 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.