My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET 2021-06-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
06/15/2021 Regular
>
FULL AGENDA PACKET 2021-06-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 10:12:11 AM
Creation date
7/12/2021 8:43:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/15/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
729
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• I,ocalion <br />• Dimensions <br />• Asset identilicalion number <br />• Trash capture device type and condition <br />• Damage (faceplate, prot;etion bar, manhole, interior, inletlautletPipes) <br />• Obstntctions or vcgctation growing <br />• Condition of "Nip Dumping" stencil <br />• Volume of trash, debris, and sediment removed during cleaning <br />• Inlet/outlet pipe diameter and material <br />C Stencil "No Dumping Drains to Occan" on the top of catch basin inlCLs. <br />g. Install and/or repair trash capture devices in Municipal catch basins, including but not <br />limited to: <br />• Connector Pipe Screen (CPS) units <br />• Auto -Retractable Screen (ARS) units <br />• Other deVICCs listed on the State Water Resources Control Board Certified <br />Full Capture List ofTrash Trcatnctit Control Devices: <br />http.J/www_w-atcilurinl._c�J_,rnv/N-ateY�Y .iu�n rrtm;/ f a�mw;:�tcY/doc_a/ <br />Ir lilt Ylnt_rl nY neap Yn/r r Yq_fr rl_L ;alcyu h a_If,l 1,?0.2,1. hill <br />h_ Provide on -call operations, maintenance, and repair services for the City's First Street <br />storrnwatcr lill station, including but not limited to- <br />• Monitoring storm eveuts and petonniug inspections to verity lift station is <br />operational and ready to pump stormwater <br />• Vacuum cleaning lift station wet -well, stormdrain lints, and catch basin <br />inlet~ as -needed <br />• Responding to and resolving urgent issues with the lift station ?4-h0tlr5 a <br />day, 7-days a week <br />• Conducting electrical and mechanical repairs or uoubleshooring as -needed <br />The City will provide hasic training on storm ovater 1{fl station operations. <br />Contractors shall resprurd to lift station issues within 1-hr of initial request. <br />i. PrOCnre and install metal gates within or at the outlet of stormdrain facilities. At a <br />mininnun, metal gates shall: <br />• Prohibit access by the public into storuichrain facilities <br />• llave a tamper -proof locking mechanism for dry -weather conditions <br />• Be capable of opening freely during storm conditions or debris blockage <br />City Council <br />26 — 21 6/15/2021 <br />City of Santa Ana Ri'1' 21-O04 Page Al-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.