My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET 2021-06-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
06/15/2021 Regular
>
FULL AGENDA PACKET 2021-06-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 10:12:11 AM
Creation date
7/12/2021 8:43:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/15/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
729
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO.1 <br />ATTACHMENT 2 <br />4. The lag ptunp shall be stopped once the level reach to 40". <br />5- The Backup Pump (Pumpl , 60hp) shall Stan once the level is 50"- <br />6- The Backup Pump shall stop once the level is at 30"- <br />Required Maintenance: <br />1. Checking the level of the solids at main manhole and wet well after each <br />rain or monthly. <br />2- Checking, cleaning and calibrating the level sensor after each solid removal <br />or as needed- <br />3. Checking the oil level at the pump 1 tank weekly and alter each rain. <br />4. Checking the check valves operation cvery 3 months and each rain. <br />5_ Chccking the performance of the pump. The historian at HMT and SCADA <br />program shall provide required information- <br />6. Checking mechanical seal for pump 2 and 3, the IIMI and SCADA shall <br />provide the required information. <br />7. Controlling the exhaust Tan pertornicuiec. <br />S. Exercising G-ansfer switch every year. <br />9- Dusting and cleaning panels as required- <br />10. I,ubricaling the molor's bearing Iorpump 1, every year. <br />IL Checking the T'T,(' program and performance every year- <br />12. Checking and changing the backup batteries at UPS and PLC. As needed. <br />13. Checking the comtnunication of the station kith SCADA system. <br />FLOWEk STATION: <br />The Plower- station is vary similar to the Santa Ana station "ith the Billowing <br />changes: <br />1. No Vertical turbine pumps. <br />2. Manual transfer switch is 200 Amp. <br />City Council 26 — 53 6/15/2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.