My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET 2021-06-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
06/15/2021 Regular
>
FULL AGENDA PACKET 2021-06-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 10:12:11 AM
Creation date
7/12/2021 8:43:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/15/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
729
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OcEnminkOHLUE <br />ENVIRONMENTRI. SERVICES. INC. <br />PREFERRED RATES FOR CITY OF SANTA ANA <br />EFFECTIVE. APRIL 1, 2021 <br />DEFINITIONS <br />Straight l-ime: Monclay through Friday, li-om 7:00 AM to 4:00 1'M <br />Overtime: Monclay tlurough Friday, before 7:00 AM and alter 4-00 PM, <br />and all day on Saturdays <br />Premium Time: Sundays, Following TTolidays and after 12 hi, of work <br />HOLIDAYS OBSERVED <br />Neu Year's Day <br />I abor Day <br />Martin Luther King, tr:'s Birthday <br />Presidents Day <br />Veterans Day <br />Memorial Day <br />Fourth of July <br />Thanksgiving Day <br />Day after Thanksgiving <br />Columbus Day <br />C111'istuirs T)ay <br />MINIMUM CHARGES <br />Four (4) hour minimum charges will apply to all call outs_ Portal to Portal rates apply - <br />Time charges include personnel, equipment and materials for preparation, mobilization. <br />travel to and tiom site, demobilization, decontamination, transportation and <br />unloading- <br />DISPOSAT ANT) OUTSIDE COSTS <br />All disposal, services, non -heavy cquipmen[ Ml[als, and materials not on the rate S11CC1 will <br />be billed a1 cos[ plus a ten percent (10u��) handling charge. Heavy equipmcm rcmal will <br />Lie billed at cost plus ten percent (10%) handling charge clue to higli liability cost- <br />PREVAILINCWAGE <br />An additional SIO pa' hour will he added Lo personnel and equiprncnL with OPcratOr rates <br />PAYMI-A l I F[ZM <br />All terms are net lorry live (45) days upon receipt of invoice, unless previous amingemctuls <br />Ci y TOOuncl I c v—'11-014 6 1 72021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.