My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET 2021-06-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
06/15/2021 Regular
>
FULL AGENDA PACKET 2021-06-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 10:12:11 AM
Creation date
7/12/2021 8:43:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/15/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
729
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Current Municipal Code <br />EXHIBIT 1 <br />Sec. 33-54. -Preservation of newly constructed and reconstructed arterial streets. <br />In order to preserve the ride quality, structural integrity and appearance of newly constructed or <br />reconstructed arterial streets, the following conditions are hereby imposed: <br />(a) Cutting or opening arterial.str-eets. <br />(1) Newly constructed or resurfaced arterial streets shall not be cut or opened for a period of <br />five (S) years following construction or resurfacing, except in the case of emergency or <br />imminent peril to life, limb or property, as determined by the city engineer. <br />(2) Upon a showing of good cause, the city engineer may permit newly constructed or <br />resurfaced arterial streets to be cut or opened prior to expiration of the five-year period <br />following construction or resurfacing. Any such exception shall require specific written <br />approval by the city engineer. <br />(b) Connection of service /atera/. For new utilities' service laterals, a maximum street opening of <br />four (4) feet by four (4) fee[ may be made directly over the utility for purposes of connecting <br />the service lateral. Notwithstanding the foregoing, the lateral itself shall be bored orjacked <br />from the property line of the property being serviced. <br />(c) Compliance with construction requitetnents. All street openings, trenching, backtilling and <br />resurfacing shall at all times comply with the City of Santa Ana Standard Plans, as specifically <br />approved in writing by the city engineer. <br />(d) Requirement ofpermit. All street openings shall be subject to the then -current street work <br />permit requirements and fees- <br />(e) Appeal. An applicant shall have the right to appeal any decision of the director of public works <br />under this sec Lion 33-54 pursuant- Lo the provisions of Chapter 3 of Lhe Santa Ana Municipal <br />Code. <br />(Ord. No. NS-2054, � 1, 4-16-90; Ord. No. NS-2447, § 7, 10-2-00) <br />City Council <br />36 — 3 6/15/2021 <br />1 /1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.