My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET 2021-07-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
FULL AGENDA PACKET 2021-07-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2021 12:33:17 PM
Creation date
7/12/2021 9:06:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A�aca <br />bolts, structural steel, masonry and other types of work in accordance with the. California <br />Building Cock (CBC) and the contract dOCtt111Cnl3. <br />AFSCO currently has 35 employees, with 4 registered engineers and geologists and we are a <br />member ol' Union Local 12 and can obtain additional inspectors as needed. All materials <br />testing and special inspections, observation services, and geotechnical engineering will he <br />provided under the technical direction of a full-time registered professional engineer with a <br />minimum of thirty -live years' experience in geotechnical engineering and construction <br />materials testing and depnty inspection. <br />Diaz and YOninian Associate (DYA) will be a sLb-cotisultam to AESCO and meet the <br />requircnients of the DBE program. <br />AESCO will respond within 24-hours upon reouest by the Department. All testing will be <br />performed in ARSCO's Catrans, ARMT., CCRT., City of Los Angcles, and DSA approved <br />laboratory and all work will be in compliance with applicable goventing local, State and Federal <br />akencie, and laws. AESCO has used cloud computing and p <br />otltu forms of technology to streamline clicill ShareFile' <br />communication, improve the docuntcntation process and <br />provide technicians an efficient way to record results. Allowing, clients and team members the <br />ability to verify and tract: the status of our field, shop and lab work- This method has improved <br />projcet tracking, collaborating on solutions and ensuring dre projcei is inspcetcd in accordancc <br />with the contract documents and intent of the design prolcssionals. <br />This proposal is sinned by Mr. Adam Chamaa, PT, C-T-- who is authorized to hind AP,SCO- <br />It you need further nssisrancc regarding this matter, please give feel froc to call either myself or Ms - <br />I OINI Np'CZ. We look forward ro hrirint; from yon. <br />Very truly yours, <br />AESCO- Inc. <br />Adam Chamaa, MSCF, P-L C-F- Debra Perez <br />Enginccring Manager Project Manager <br />Kay Alabed <br />Presidcni <br />yC.ur4 ITIL 11u11 Material Testing/lasprctiun 4 Lnviraameutal ♦ PLItchnical Lagineeriag Ser ccs <br />
The URL can be used to link to this page
Your browser does not support the video tag.