Laserfiche WebLink
Dins roxtrxMAta <br />0. �(tl n(An1 D• <br />l,a r,l, p,...[�✓N "eAri .KS <br />OCTA OC Streetcar Project, Santa Aria, CA <br />'I he OC Streetcar project consists oftlnc design and construction <br />of a two -track streetcar system tionl the Santa Ana Regional <br />Transportation Center (SARTC) in Santa Ana to the proposed <br />Rcgiunal I ransir CunnCvriun and sration in (raider Grove, <br />approximately 4 miles. The proixt also includes design and <br />construction of a maintenance and storage facility and two new <br />bridge stmcnrres. <br />'I tic. ilia intcnancc and storage facility is pltuincd to house all <br />light revenue maimenance linctiollS, including operations. <br />This will accommodate administration, operations, <br />maintenance, repair bays, and parts storage. A maintenance <br />building, awash huilditig, parking lots, and a fire lane arc <br />also included. <br />10 r M ' 4 ik 4 I` <br />The Santa Ana River Bridge ix an approximately 356-loOL-long, 3-span, precast, pre-SueSSed concrete, <br />Callraus, wide -flange girder hridgc. Spans Vary from approximately 80 to 138 feel and will eany the OC <br />1t'CCLCar light rail tracks over the Sanla Ana River and adjacent Santa Ana River Tvail. Traf'fic on the bridge <br />consist, of two u-aeks. Two reinforced concrete pier walts weir proposal for the lives- piers. Short scat <br />abutments on a Single row of cast -in -drilled -hole (CIDII) piles were proposed to minimize earthwork. <br />accommodate thermal tnovetnemi , and use the Same foundation type a, the piers. The Westminster Avenue <br />LIP was proposed as an approximalcly 231-foot-long, 2-spair, cast in place, post ten9ioned concrvw box girder <br />bridge. Spans are approximalcly 111 W 120 feellong and will cant' the OC St-cacar light rail tracks over <br />Westminster Avenue. Trallic on Ilene bridge consists of two tracks. High, call ilecer abutments were proposed <br />to minimize Span length_ A Single, non -skewed, oblong column bent was proposed to tit within the available <br />1441101 median width, teasarcd face -to -rift ofuirh, on Wesirnin,tcr Avenue. <br />I)YA provided a Phase I Haiardous Waste hivironmeanal Site Assessment for the portion of the project <br />within OCTA'S Pacific Electric. Railway right-of-way tiom Harbor Boulevard to North Raitr Street and a <br />gcorechnicel invcstigatirm to[. the entire alignmart, including soil boo ings, laboratory analysis, engineering <br />analyses, and gcolcchnical reports. DYA subsequanly po-ronnal a supplomental carvironnmpnal site <br />investigation in the Pacific Elcoric righl-of-way .rid has been providing construction Supporl and <br />observation services. <br />Key DVA Personnel: S. Niianianan, Pp, GF—Gcomehnical Manager <br />Chrislophcr M. Diar, PI(. GIF— Cicutwhnical Principal <br />Chaiunya (KC) Kukutla, EIT—Environnaual Enlginarr <br />Jorge Sandoval, PE, GE — Construction Observation <br />Owner: <br />Orange County Transportation Authority <br />Mr. William Farthing, PE <br />Prog,ranm Manage <br />550 S. Main St. <br />Orange, CA Qxii3 <br />It(itthi�r orrar n�_t <br />714-560-5813 <br />DVA Client: <br />HN I'B <br />Mr. ferry Nash <br />Vice Piesidcnt <br />200 P.asr Sandpointe AVenn,e, Suite 200 <br />Santa Ana, CA 92707 <br />to i ,h(ahntb.�om <br />480-262-5994 <br />City Courko repletion Date: 2020 (1 all) 21 — 4XVA tees: $1,183,700 (rcr/1M9021 <br />