Laserfiche WebLink
atiF��'tl� <br />A II Y'f v P op,I :: l 1d„ IM< 1 <br />"YWrrlllcffit.o A'.,�N�llIITdIL®II➢tb <br />lf), bra IYV'!'re7 <br />Projec'r Manager <br />Debra Perez has been a project manager for various geotechnical and <br />environmental engineering projects for over 30 years. Ms. Perez has <br />been project manager for a variety of projects including construction of <br />new above ground oil storage tanks for ARCO, City of Lynwood Senior <br />Center, new natural gas pipelines and steam generating facilities for <br />Southern California Edison, several freeway and road projects including <br />new embankment fills, new bridges, grade separations, pavement <br />design and survey of existing road conditions, and new <br />telerommunications facilities throughout California. Ms. Peru' <br />experience includes hazardous waste investigations, supervision of the <br />soils laboratory and preparing reports for compaction, preliminary soil <br />investigation, distress investigation, and slope repair projects. <br />Slp,e Ric iliobec::f Expevilenc,e, <br />q1 vJr} VrSaBn;' <br />d',+a it Z +ns;lneeadovt: <br />(.vnff dernxdr'*Werdx'a <br />d ,,,•avail, <br />r irlr/,a+weI'l S;me <br />f1wav, rwiv fRAm, <br />dB,'Ich, (.'aadijod it# <br />R. A, , k?rn.f i ,aehrt <br />Nnavwq I R a , r a<raa�cnL <br />'.', dJerxv.^a��aIIh�.np. <br />4IIdnfiiaaerae. dYtwi, 107rf <br />Gold Line Foothill Extension Phase 2B, Azusa to Montclair- Los Angeles County <br />Project Monoger: Ms. Perez was the Project Manager for the geotechnical investigation for drainage <br />and road crossings for the Gold Line Foothill Extension Azusa to Montclair project for the Los <br />Angeles County Metropolitan Transportation Authority. The project follows the right-of-way (ROW) <br />of the old Atchison, Topeka and Santa Fe Railway's Second Division through the Foothill Cities. <br />Belmont Pool Rebuild -Revitalization -City of Long Beach <br />Project Manager: Ms. Perez was the Project Manager for a geotechnical and Phase II environmental <br />investigation for the new Belmont Pool for the City of Long Beach. The project generally consists of <br />constructing an indoor pool which is approximately 85 feet by 190 feet in plan dimension housed <br />inside an approximately 60, 000 square foot structure. The structure will include a second -story <br />banquet facility, locker rooms, restrooms, pool storage, offices and a basement level mechanical <br />room. An outdoor pool with a plan dimension of approximately 85 feet by 185 feet will be located <br />just cast of the structure. There will also be a restaurant near the southwest side of the structure. <br />Two small pools will also be constructed; a teaching pool just south of the indoor pool and an <br />outdoor recreation pool just south of the outdoor pool. Soil samples were collected and tested for <br />hydrocarbon, heavy metals, volatile organics, and BTEX. Water samples were collected and tested <br />for the presence of petroleum hydrocarbons and motor oil. Geotechnical recommendations were <br />provided for prestressed concrete piles and drilled pier foundations. Recommendations for shallow <br />foundations were also provided. Recommendations were also provided for a basement structure <br />including shoring and excavation. <br />Soundwalls for the 210 Freeway -Los Angeles County <br />Project Monoger: Ms. Perez was the Project Manager for the geotechnical investigation for new <br />soundwalls on the 210 Freeway in Los Angeles County for Caltrans. I he project included logging and <br />classification of soil borings, laboratory testing and foundation design recommendations for new <br />bridge and retaining structures and soundwalls. A geologic seismic hazards screening was also <br />performed. Research was conducted on existing geotechnical and geologic reports. <br />CmcYHnial Testing/ Inspection <br />Environmen al an Geotechnical Engineering Services <br />www.AoscoTech.com <br /><> I r 2? ,- 48 <br />2at[diEll�O.��x e: ten <br />'�maan 7lae fRaaed Zip <br />