Laserfiche WebLink
atiFf�'f� <br />A II Y f v P opo<:al ld,, IM< 1 <br />'YWrwlln;ntt.o A'.,�Na�llIITdIL®II➢tb <br />Inspector and Field Engineer, E.I.T. F re a r: n a B „„h <br />Mr. Omar Chamaa has over 15 years of experience in the field and in laboratory testing 'r:r7rgeaojjx S.'IJYC <br />and inspection of construction materials such as concrete, steel, anchors, soils and +I In werwp' L.noang <br />grading. Mr. Chamaa has performed construction materials testing and inspections for dda•M1aa;Br dt.,r'.. 2'nrfd <br />9irr.»,dBnbe wren;;, lfilBN. <br />multiple Caltmns and OCTA projects, which included bridges, roadways, utilities <br />fo ndaIn - pipe Installations lift stations and retainin wall cons ct-oi Mr <br />u , pip , g u <br />("✓ok'S4'oyi rcod <br />Chamaa was responsible for construction material approval, such as: select fill, <br />CexaB6dr. nNA„.o n,a.r <br />foundation excavation, slope cut, steel installation, and concrete mix design for various <br />BiPA'. <br />projects. I le attended construction meetings to discuss material approvals, deficiencies, <br />1CC d rrai3Oird <br />modifications, as well as providing final observation reports to the client. <br />i(',ryanc;aca„ dnvsdra•cace <br />Q dYd LAM (Mrbs <br />Specific Project N xpe6erice <br />� .rrrilri, zM1• g <br />Widening of the 1-40S Freeway, Euclid St. to I-60S-Orange County, CA <br />Project Manager: Mr. Chamaa is the Project Manager for the Quality Verification <br />B'dexanaarf :yeoern,p;dda <br />materials testing and inspection during widening Of the 1 405 Freeway between Euclid <br />"nj A°rt'G Gd rulienr, <br />Street and the 1-605 Freeway, a total of 16 miles, for OCTA and Caltrans. The widening <br />d �"'Yplg w'vre <br />project includes construction of now lanes on the southbound and northbound sides, <br />xr�M1•>"°fin m'U'dkwdr <br />'M1BnSgfi <br />retaining walls, bridges, etc. The testing and inspection services include a review of <br />Q �llnrarn ra. <br />concrete mix designs, concrete testing and inspection, concrete batch plant inspection, <br />LCeraea9 t, dddraad �.�rc^r <br />Ve <br />d ,grgb:Nl <br />pile inspection and logging, rebar inspection, aggregate testing, welding inspection, <br />{bvp,, ,r/ 1A.r•nrdrn, r9 <br />subgrade testing and inspection, base material evaluation and testing, compaction testing <br />p,•,,,,.r. do dney i'fi"'C„P <br />and inspection, and asphaltic concrete testing. Mr. Chamaa also prepared the Quality <br />BAc.IolAir Bm ddi n,t; _ <br />Manual for the project including all forms_ <br />Iw'd,cclor <br />First Street Bridge Replacement -City of Santa Ana <br />Gr�nrv�r qd r,grrr mend <br />Inspector: Mr. Chamaa was the Inspector for the construction materials testing and <br />inspections during the replacement of the bridge. Geotechnical services consisted of pile <br />Bao sgnw•rr.nn <br />driving parameters evaluation and selection of fill materials. Testing and inspections <br />.d d'L d rrA&p'er M1d <br />were conducted on piles, welding, structural steel, precast concrete, concrete, asphalt <br />d avaaerr • d'wid <br />k" srasr{ L �A'n re aaA <br />mix designs, etc. <br />`'L d o- rAa'yra'r rd <br />baanxede <br />Warner Avenue Gravity Sewer Lift Station C — City of Huntington Beach, CA <br />B.,rq�rtrran'.+nrp d",tdto-pr; <br />Field Engineer: Mr. Chamaa was the Field Engineer for the construction materials testing <br />A'f.1mm has <br />and inspection and for the geotechnical and environmental Phase 11 investigations for a <br />t"arlr "I L.rnab •; ',. <br />new lift station facility. the project consisted of the replacement of the existing Lift <br />tle'J<h ddetoi rrr'red <br />Stations B and C and the Sunset Beach Sanitary Lift Station with a new Lift Station C. The <br />BA pugy� hodM1drnn," <br />submersible lift station incorporated a 14 foot by 26 foot by 22 foot deep wet well. The <br />Batypeeg9.r <br />bottom of the well foundation was approximately 26 to 27 feet below existing grade. The <br />e idn` 'J/' Rel"""rsr"dr" <br />new lift station also included an 9-foot deep valve vault which was 15 feet by to feet in <br />leelvdytvw °„d il, qufn <br />plan dimension, a 60 kW outdoor generator, and electrical panels. <br />Msdnrrc.d-ae <br />lY"wa-i'liMd liffleiadiooa <br />14-Inch Water Line Installation under Huntington Harbor Channel —City of <br />4°"agv `poveaab.�dw,e <br />r"a {�rt'ryArnra ParuA' '. <br />Huntington Beach, CA <br />Field Engineer Mr. Chamaa was the Field Engineer for a geotechnical investigation for a new 14-inch <br />diameter water line composed of High Density Polyethylene (HDPE) pipe. The length of the new pipe ranged <br />from 750 feet to 950 feet. The pipe was installed beneath the Huntington Harbor bottom which is at an <br />approximate depth of 20 feet below high sea level. The water line connected to existing <br />water systems on <br />either side of the channel. <br />Cr MVCM YH61131 Testing/ Inspection <br />Environmental and Geotechnical Engineering Services <br />www.AoscoTech.com <br />aC' I I- 2? ,- 50 <br />'�maan 7lae fRaaed Zip <br />