<br />Inspector and Field Engineer, E.I.T. F re a r: n a B „„h
<br />Mr. Omar Chamaa has over 15 years of experience in the field and in laboratory testing 'r:r7rgeaojjx S.'IJYC
<br />and inspection of construction materials such as concrete, steel, anchors, soils and +I In werwp' L.noang
<br />grading. Mr. Chamaa has performed construction materials testing and inspections for dda•M1aa;Br dt.,r'.. 2'nrfd
<br />9irr.»,dBnbe wren;;, lfilBN.
<br />multiple Caltmns and OCTA projects, which included bridges, roadways, utilities
<br />fo ndaIn - pipe Installations lift stations and retainin wall cons ct-oi Mr
<br />u , pip , g u
<br />("✓ok'S4'oyi rcod
<br />Chamaa was responsible for construction material approval, such as: select fill,
<br />CexaB6dr. nNA„.o n,a.r
<br />foundation excavation, slope cut, steel installation, and concrete mix design for various
<br />BiPA'.
<br />projects. I le attended construction meetings to discuss material approvals, deficiencies,
<br />1CC d rrai3Oird
<br />modifications, as well as providing final observation reports to the client.
<br />i(',ryanc;aca„ dnvsdra•cace
<br />Q dYd LAM (Mrbs
<br />Specific Project N xpe6erice
<br />� .rrrilri, zM1• g
<br />Widening of the 1-40S Freeway, Euclid St. to I-60S-Orange County, CA
<br />Project Manager: Mr. Chamaa is the Project Manager for the Quality Verification
<br />B'dexanaarf :yeoern,p;dda
<br />materials testing and inspection during widening Of the 1 405 Freeway between Euclid
<br />"nj A°rt'G Gd rulienr,
<br />Street and the 1-605 Freeway, a total of 16 miles, for OCTA and Caltrans. The widening
<br />d �"'Yplg w'vre
<br />project includes construction of now lanes on the southbound and northbound sides,
<br />xr�M1•>"°fin m'U'dkwdr
<br />'M1BnSgfi
<br />retaining walls, bridges, etc. The testing and inspection services include a review of
<br />Q �llnrarn ra.
<br />concrete mix designs, concrete testing and inspection, concrete batch plant inspection,
<br />LCeraea9 t, dddraad �.�rc^r
<br />Ve
<br />d ,grgb:Nl
<br />pile inspection and logging, rebar inspection, aggregate testing, welding inspection,
<br />{bvp,, ,r/ 1A.r•nrdrn, r9
<br />subgrade testing and inspection, base material evaluation and testing, compaction testing
<br />p,•,,,,.r. do dney i'fi"'C„P
<br />and inspection, and asphaltic concrete testing. Mr. Chamaa also prepared the Quality
<br />BAc.IolAir Bm ddi n,t; _
<br />Manual for the project including all forms_
<br />Iw'd,cclor
<br />First Street Bridge Replacement -City of Santa Ana
<br />Gr�nrv�r qd r,grrr mend
<br />Inspector: Mr. Chamaa was the Inspector for the construction materials testing and
<br />inspections during the replacement of the bridge. Geotechnical services consisted of pile
<br />Bao sgnw•rr.nn
<br />driving parameters evaluation and selection of fill materials. Testing and inspections
<br />.d d'L d rrA&p'er M1d
<br />were conducted on piles, welding, structural steel, precast concrete, concrete, asphalt
<br />d avaaerr • d'wid
<br />k" srasr{ L �A'n re aaA
<br />mix designs, etc.
<br />`'L d o- rAa'yra'r rd
<br />baanxede
<br />Warner Avenue Gravity Sewer Lift Station C — City of Huntington Beach, CA
<br />B.,rq�rtrran'.+nrp d",tdto-pr;
<br />Field Engineer: Mr. Chamaa was the Field Engineer for the construction materials testing
<br />A'f.1mm has
<br />and inspection and for the geotechnical and environmental Phase 11 investigations for a
<br />t"arlr "I L.rnab •; ',.
<br />new lift station facility. the project consisted of the replacement of the existing Lift
<br />tle'J<h ddetoi rrr'red
<br />Stations B and C and the Sunset Beach Sanitary Lift Station with a new Lift Station C. The
<br />BA pugy� hodM1drnn,"
<br />submersible lift station incorporated a 14 foot by 26 foot by 22 foot deep wet well. The
<br />Batypeeg9.r
<br />bottom of the well foundation was approximately 26 to 27 feet below existing grade. The
<br />e idn` 'J/' Rel"""rsr"dr"
<br />new lift station also included an 9-foot deep valve vault which was 15 feet by to feet in
<br />leelvdytvw °„d il, qufn
<br />plan dimension, a 60 kW outdoor generator, and electrical panels.
<br />Msdnrrc.d-ae
<br />lY"wa-i'liMd liffleiadiooa
<br />14-Inch Water Line Installation under Huntington Harbor Channel —City of
<br />4°"agv `poveaab.�dw,e
<br />r"a {�rt'ryArnra ParuA' '.
<br />Huntington Beach, CA
<br />Field Engineer Mr. Chamaa was the Field Engineer for a geotechnical investigation for a new 14-inch
<br />diameter water line composed of High Density Polyethylene (HDPE) pipe. The length of the new pipe ranged
<br />from 750 feet to 950 feet. The pipe was installed beneath the Huntington Harbor bottom which is at an
<br />approximate depth of 20 feet below high sea level. The water line connected to existing
<br />water systems on
<br />either side of the channel.
<br />Cr MVCM YH61131 Testing/ Inspection
<br />Environmental and Geotechnical Engineering Services
<br />www.AoscoTech.com
<br />aC' I I- 2? ,- 50