Laserfiche WebLink
AESCO <br />T170 <br />T171 <br />T172 <br />T177 <br />T178 <br />T179 <br />SCnPdc e of -ees <br />EffeCL ve,anuary2021 <br />Fie IACoring Technician ................................................................................................$ 115 <br />Nondestructive Examination Technician, UT, MIT, LP ................................................$ 120 <br />Structural Steel Fabrication lnspector(AWS)............................................................$ 120 <br />Senior Environmental Technician...............................................................................$ 125 <br />EnvironrnerAdl Technician..............................................................................._..........$ 120 <br />BuildingInspector........................................................................................................$ 130 <br />Fabrication Shop Inspections <br />Cost (per hour) <br />1113 Structural Steel Inspector (IC( 0)................................................................... <br />..... ..$ 11S <br />T174 Structural Steel Inspector(AWS)................................................................................$ <br />115 <br />T175 Batch Plant Quality Control Tech nician/Inspector..................................................... <br />115 <br />T176 Reinforced Concrete, Prestressed Inspector.............................................................$ <br />115 <br />Field Inspector/Technician Hours <br />No Work Performed (Work Cancelled)..........._............_....................................................... <br />Minimum 2-hour Charge <br />All field services charge..._............._........................................................Minimum4 <br />and 8-hour Charge Thereafter <br />Reeular Work Hours <br />First 8 hours, Monday through Friday, between 5:00 am. to 5:00 p.m. <br />Direct Project expenses outside services will be charged at Cost+ 15%. <br />Time and One -Half <br />Any increment pastfirst 8 hours through 12 hours, Monday through Friday <br />First 12 hours on Saturday <br />Shift between 3:00a.m. and 5:00a.m. <br />Double Time <br />Any hours past 12 hours Monday through Saturday, all day Sunday and Federal Holidays <br />Field Analysis <br />Cost <br />(per hour unless otherwise noted) <br />G200 <br />Soil Boringwith I ollowStemAugerDrillingPortal toPortal, perhour........_.........$ <br />3,05 <br />G201 <br />Backfill Boreholeswith Bentonite, per foot...............................................................$ <br />25 <br />G202 <br />Backfill Borcholcswith Grout, perfoot ......................................................................$ <br />35 <br />G203 <br />DrumrningandDispnsalofClean Cuttings, perdrum............................................._$ <br />390 <br />G204 <br />Fire Water Buffalo, pet day.........................................................................................$ <br />550 <br />G2uSSupport <br />Truck,porday................................................................................................$ <br />1S0 <br />G206 <br />Water Truck, per day.... ... ...... <br />450 <br />G207 <br />Mobilization and Demobilizationfor Rock coring, each ..........._ ................._...._.....$ <br />1150 <br />G208 <br />Ruck Coring, Per hour..................................................................................................$ <br />455 <br />G209 <br />DecontaminationofVehicleandEquipment, each ...................................................$ <br />300 <br />6210 <br />Field Resistivity, upto3arrays,maximum distance of40ft.,each ......._..._...........$ <br />1800 <br />G211 <br />Environmental Soil BoringwithHollowStcmAugcrPorraltoPortal, perhour...... <br />5 <br />425 <br />until 21 - 70 ` "4' " r7`fBr/2021 ' ',�/ ' <br />iv r Or" itJ and C "�,. i r <br />