Laserfiche WebLink
♦ submit a final report to the Cily within five working days upon completion ol'each project. <br />S. SPECIAL REQUIREMENTS <br />Since sonic of the city project` will be funded by Rxferal or State gqmns, the scleckXt consulting Alin mint <br />comply with requirements of Caltrans' consuuuction manual and the following_ <br />Certificate of Personnel <br />♦ The personnel who will conduct the sampling and testing must be certified. I hey can be <br />certified by Caltrans' District Materials Engineer, by the National ilstitute Certification of <br />Engineering Technologies, or by other authority acceptable by the CAmsh7tet1011 Engineer <br />of the City to be proficient in accepting sampling and testing. <br />♦ A copy of each person's certificate must be on tilt in the office of the Construction <br />Engineer. The certificate shall list the type of work which the individual is authorized to <br />perform. <br />♦ The testing laboratory must be under the supervision of 3 registered engineer with <br />experience in inspection and testing of construction materials. This engineer shall certify <br />the results of all tests performed by the lab personnel tinder his/her supervision. <br />♦ The selected fine Hurst maintain the laboratory testing equipment in accordance with <br />recogrtized national standards - <br />The selected firm roust have an independent assurancc testing and sampling program. This <br />program can be performed either by their own personnel not involved in the acceptance <br />testing and sampling, or by another quality assurance organization. <br />♦ Correlation Testing Program: The Materials Laboratory shall be a participant in one or <br />more of the following testing programs: <br />♦ AASI I FO Materials Retcrencc I.aboratory(AR MI.) <br />♦ Cement and Concrete Reference Laboratory (CCRL) <br />♦ Caltrans' Reference Samples Program (RSP) <br />Acccntance Testing and Satnplin$! <br />♦ The selected testing laboratory shall conduct acceptance testing of materials on the first day <br />when work is performed, and continues daily until the wort; is completed. <br />City Council City of Santa Ana RgR 2-08r7 1 716/2021 <br />Page Al-3 <br />