Kleinfelder Statement of QualificationS for Qn-Call Material Testing and Special lnSpeCtlon Services
<br />for City of Santa Ana, RFH No. 20-111
<br />Greg Johnson, PG, CEG,
<br />Under the rr,« , vqm , iu, i ,.f 0, ,, i f e,« i n;a„ tm' � n thn.,
<br />Laboratory Supervisor
<br />Kleinfelder has been consistently providing quality and effective on -call
<br />626.458.7986
<br />materials testing services to the County. Projects include AC
<br />gjohnson@dpw.lacounty.gov
<br />pavernent grind and overlay, reconstruction of concrete curbs and
<br />Relevance to this Contract:
<br />gutters, sidewalks, median islands, curb ramps, driveway approaches,
<br />• Field investigations
<br />alleyintersections, another appurtenant
<br />work. Under the current-
<br />Construction monitoring
<br />• Laboratory testing
<br />contract, we have performed work on r, m, mpnl a r„ „ o rr„aa Kleinfelder
<br />7.o
<br />• Evaluation
<br />services are performed in accordance with the , W'1
<br />- Recommendalions
<br />m rr., :a V;A '% a or, CI. i,ai „. . n.r:,' na
<br />• Materials testing & inspection
<br />Martin Luther King, Jr. (MILK) Medical Center Campus East
<br />• Independent assurance testing
<br />Parrking Structure. Klcinfclder's Tcam included several County
<br />Key Staff
<br />certified special inspectors with past experience on post -tensioned
<br />• Dany Hanna. PE. MS, MBA
<br />parking structures in accordance with County and relevant
<br />• Mike Dorsch
<br />requirements/specifications. Kleinfelder also provided an Inspection
<br />- Bryan Reese, ASP
<br />Coordinator to fulfill and document the contractor's inspection
<br />• Roger Khoudessian, PE
<br />requests. We additionally provided multi -certified special inspectors
<br />• Rick Bell
<br />as -needed to observe placement of relnforcing steel, post -tensioned
<br />- Dorninic Monlemayor
<br />tendons, concrete, masonry block, masonry grout, anchor bolts, epoxy
<br />• Eric Kennedy
<br />• Kim Byrd
<br />dowels, and structural steel welding for this multi -story building.
<br />- Jason Eckerson
<br />Arcadia Mental Health Center Replacement. Kleinfelder provided
<br />• Robert Carman
<br />construction materials testing and special inspection services on
<br />• Mike Carman
<br />behalf of the County to assess conformance with the project
<br />- Jeffrey Diaz
<br />structural plans and specifications during construction. Our rnulti-
<br />• Cameron Massa
<br />certified, in-house technicians and inspectors provided staffing
<br />• Julian Calderon
<br />consistency and scheduling on this project, maintaning costs and
<br />- Michael Magana
<br />maximizing efficiencies.
<br />• Vartan Deirdeirian
<br />CLIENT BENEFITS
<br />Raoid local response of nearly two dozen local, certified materials
<br />testers and inspectors through our centralized dispatching system -
<br />minimizing costs associated with travel by utilizing staff who reside
<br />near the project sites.
<br />Client: Caltrans, District 8
<br />Under the ,d i arr�r roa- fl M Or m„o r W „d, Vl rf l4 .
<br />Fee: $3.3 Million
<br />Kleinfelder is currently providing construction materials sampling and
<br />Duration: 2017 - Ongoing
<br />testing and batch plant (asphalt concrete/PCC) inspection services to
<br />Reference:
<br />Godson Anyanwu. Chief
<br />improve the State transportation system throughout Caltrans District
<br />Caltrans Southern Regional Lab
<br />8, Our services are performed by materials engineering testers
<br />(SRL)
<br />holding the appropriate Caltrans, ACI and AASHTO certifications at
<br />951-232.3834
<br />numorous project sites and material supplier batch plants.
<br />Godson —Anyanwu ctidot.ca.gov
<br />nos, wa-f.ru V „ „a forr %I r ern „m, a;-,c , performs project scheduling and
<br />Relevance to this Contract:
<br />field coordination, review and distribution of daily field reports, materials
<br />• Construction materials
<br />documentation and information, and prepares reports to Caltrans
<br />observation
<br />standards and requirements. Our materials testers work together under
<br />- Materials testing per CTMs
<br />our rr„ :r 4-dr r . „. Ir•sl«:: Or
<br />and Caltrans Construction
<br />Manual
<br />CLIENT BENEFITS
<br />- Concrete and HMA batch
<br />Kleinfelder's multi certified Consultant Materials Testers have
<br />plant inspection
<br />,,. ma.w rr, ..a• - p -. - ,r a,r „, „ '«,7r,.rr .- t -p [c , ,,cria
<br />City Council
<br />21 — 103 7/6/2021