Laserfiche WebLink
APPENDIX RESUMES <br />CARL BACHLER, PE I <br />LABORATORY MANAGER <br />Carl Bachler has more than 12 years experience in geotechniral engineering and <br />materials testing for all types of projects Including water Infrastructure, public and <br />private development, education, transportation, and quality management. Carl is <br />engaged in concrete and asphalt paving operatinns throughout the cnnstrurnon cycle, <br />from Inlral project review for bid estimation to preparation of final reports and pay <br />factor calculations. Carl has assisted with the development of concrete mix designs and <br />directed the rJevelnpment of numerous hint mix asphalt job mix fnrmulas. <br />Projects on which Carl has served as Project Engineer include water / wastewater, <br />pipelines, K-8 and higher education projects, municipal facilities projects, public works <br />projects, and major transportation projects. <br />i //, I ,i r, I t A" r r / . 'I / M <br />CITY OF LONG BEACH, ON - CALL CONSTRUCTION MATERIALS TESTING AND INSPECTION, LONG BEACH <br />Laboratory Manager 1 Mr. Bachlrr is serving as Laboratory Manager for the City of Long Beach On -Call Contract. RMA Group was <br />chosen to provide on -call materials testing and inspection services for the City of I ong Reach. We are providing qualified personnel and <br />coordinating our efforts with the on -site Construction Inspector, including, scheduling of work, and coordination of the contractors and <br />any other persons on the. site of various Capital Improvement projects and other City projects. <br />POSEIDON DESALINATION PROJECT, CARLSBAD <br />Project Engineer 1 Mr. Bachler is responsible for providing engineering analysis and supporting the CIA team in the development of <br />the Quality Assurance Plan for this project. Working with the Laboratory Director and lab staff, he is responsible for ensuring that <br />material sampling and tests are performed in accordance with the project's Quality Assurance Plan. RMA Group is currently providing <br />materials testing and inspection on this project. <br />CITY OF GLENDALE, BEELINE MAINTENANCE FACILITY, GLENDALE <br />Laboratory Manager 1 Mr Bachler is providing laboratory management services for the Beeline Maintenance Facility Projectfor the City <br />of Glendale. RMA Group is performing inspection and testing, compaction testing, laboratory testing of concrete and steel materials <br />used in construction, anchor bolt inspection and testing, structural steel fabrication and welding as well as any other laboratory <br />testing services as required during the construction of the facility. <br />CITY OF FONTANA, SAFE ROUTES TO SCHOOL, FONTANA <br />Laboratory Manager 1 Mr. Bachler is serving as Laboratory Manager far the Safe Routes to School Project. RMA Group is providing field <br />testing and inspection forthe project Including, observation, sampling, densltytests during grading, subgiade preparation, placement <br />of asphalt, including observation of the lay -down operations and obtaining wet samples and field density tests. We are also sampling <br />the concrete placed for the curb and gutter, sidewalks, driveways and access ramps. RMA Group is also proving providing a laboratory <br />testing of solls, aggregates, concrete cornpresslon strength, and asphalt concrete, including maximum density, optimum moisture <br />content, sieve analysis, sand equivalent, extraction (percent asphalt), and asphalt concrete maximum density. <br />MULHOLLAND DRIVE AND WILSHIRE BOULEVARD BRIDGES AT 1-405, LOS ANGELES <br />Laboratory Manager 1 Mr. Bachler was part of the third party quality assurance team, provided detailed lab test documentation in <br />accordance with the. Caltrans standard specifications. Carl reviewed internal test data, and evaluated subconsultant facilities and procedure,. <br />The Mulholland Drive and Wilshire Boulevard Bridges are two of three bridges that were demolished and reconstructed to accommodate <br />the widening of the 1-40S freeway. <br />HOLLYWOOD BURBANK AIRPORT, BURBANK <br />Laboratory Manager 1 Mr. Bachler is serving as Laboratory Manager for the City of Long Beach On -Call Contract. RMA Group has <br />provided professional design and testing services at the Bob Hope Airport since 1978 and has held six mule -year contracts since <br />1986. Our first project at the airfield was a pavement evaluation, which consisted of evaluating all of the existing pavements and <br />providing design recommendations for asphalt concrete overlays and general maintenance of the airfield. RMA has provided <br />professional services on more than SO additional projects at the Bob Hope Airport including providing design recommendations for <br />new pavements, inspection and analysis of pavement conditions, development of construction specifications, and identification of <br />pavement failures with determination of the cause. <br />SR•60 / NASON STREET INTERCHANGE, MORfNO VAI I FY <br />Laboratory Manager 1 Mr. Bachler was responsible for accuracy and documentation for tests completed for quality assurance including <br />Asphalt Concrete, concrete and geotechnical testing for roadway, and ramp excavation. The SR-60 / Nason street Interchange Phase I <br />project entailed new ramps and traffic signals in preparation for the future replacement of the hridge. All four nn- and <br />n auxi iary anes were reconstructs , an n widened south o t ate the new <br />Cit�9 $`f]C�I °7i6` <br />ri ge alignment. <br />RMA Group RFP NO: 20-111 1 MATERIALS TESTING & SPECIAL INSPECTION SERVICES <br />Cvi,yPeciyrr Matters'., www.rrnocorriPoru<.,r.orr, CITY Of SANTA ANA 20-1600-P SEPTEMBER 30, 2020 Page iv <br />