Laserfiche WebLink
Exhibit 3 - Without Redline Draft <br />different specified method for determining the in lieu provisions of this ordinance, such as the <br />timing of payment or the point in time for determining the applicable in lieu fee amount, to satisfy <br />the inclusionary units from that specified by this article, provided the development agreement was <br />adopted and executed on or before MONTH DATE, 2021. <br />(c) Project with regulatory agreement. A residential project for which a regulatory agreement has <br />been approved, provided that the regulatory agreement is effective at the time the residential <br />project would otherwise be required to comply with the requirements of this article, and there is <br />no uncured breach of the regulatory agreement before issuance of a certificate of occupancy for <br />the project This may include n residential project that has obtained a density hones under article <br />XVI.I of the Santa Ana Municipal Code. Such projects cannot be used to satisfy the inclusionary <br />requirement for another project. <br />(d) Addplive Reuse. Adaptive reuse development projects pursuant to Chapter 41, Article XVI.II - <br />Adaptive Reuse. <br />( Ord. No. NS-2881, 6 2. 9-1-15 ; Ord_ No- NS-2994 , § 3, 9-1-20) <br />Sec. 41-1904. - Options to satisfy inclusionary requirements. <br />(a) On -site units. The primary means of complying with the inclusionary requirements of this article shall <br />be the provision of on -site inclusionary units in accordance with section 41-1901, above. A developer <br />may only satisfy the requirements of this article by means of an alternative to on -site inclusionary units <br />in accordance with the requirements and procedures of this section. <br />(b) Off -site units. <br />1. New units. The developer may satisfy the inclusionary unit requirements for the project, in whole <br />or in par[ by constructing the required new inclusionary housing at a different location within the <br />city borders at the ratio of one square foot of habitable inclusionary unit space for each required <br />habitable square foot. While the total habitable square footage area of the required new <br />inclusionary units must be the same as the sum -total of the number of habitable square feet for <br />the project as directed by this ordinance, the number of units and bedrooms associated with the <br />off -site units may be approved by the review authority of the city, consistent with the type of <br />affordable housing needed at the time of project review. <br />2. Rehabilitated units outside a designated target area. The developer may satisfy the inclusionary <br />unit requirements for the project, in whole or in part by substantially rehabilitating existing housing <br />units elsewhere within the borders of the city at a rate of one and one-half (1'/z) habitable square <br />feet per each required habitable square foot of inclusionary units. <br />3. Rehabilitated units within a designated target area. Upon application, the developer may satisfy <br />the inclusionary unit requirements for the project, in whole or in part by substantially rehabilitating <br />existing housing units elsewhere within the borders of the city at a rate of one habitable square <br />foot per each required habitable square foot of affordable inclusionary units. <br />(c) In -lieu fee. <br />(1) More than twenty (20) units. A resldentlal project comprlsed of more than twenty (20) resldentlal <br />lots or residential units, the developer may elect to satisfy the inclusionary unit requirements for <br />the project, in whole or in part, by payment of a fee in lieu of constructing some or all of the <br />required units. The amount of the fee allowed by this section shall be fifteen dollars per square <br />foot ($15.00/ft.) of the sum total of the number of habitable square feet within the entire project, <br />as measured from the exterior walls of the residential units. This calculation does not include <br />exterior hallways, common areas, landscape, open space or exterior stairways. <br />(2) Timing of payment. The total foe amount for the entirety of a project is calculated, determined, <br />and set at the Lime Of iSSuance Of the first building permit for the project The developer shall pay <br />all in -lieu fees allowed by this section for the entire project prior to issuance of the first occupancy <br />City Council 28 — 67 7/6/2021 <br />