My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET 2021-07-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
FULL AGENDA PACKET 2021-07-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2021 12:33:17 PM
Creation date
7/12/2021 9:06:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br />Scope of Services <br />IEA/11-01INSII Process <br />When an activity is not exempt and cannot be categorically excluded <br />from NEPA, Rincon will prepare an EA using the HUD short form <br />checklist, unless the project would clearly require an EIS under 24 CFR <br />58.37. In the event that an FIS may be required, we will advise the <br />City regarding the feasibility of preparing an EA as a means of <br />focusing the EIS and as an aid in the formal scoping process for the <br />EIS. We will dlsu advise the Cily regarding the eslirnaled cost and <br />timeframe associated with an EIS, to allow an informed decision with <br />respect to going forward with the project. <br />EAs will be prepared in accordance with NEPA and HUD requirements <br />as outlined in 24 CFR Part 50, 24 CFR Part 58, and 36 CFR Part 800. <br />The following outlines the general contents of an EA. <br />• Project proponent information <br />Conditions for Approval <br />Finding <br />• Statcment of Purpose. and Need for the Proposal <br />• Description of the Proposal <br />• Description of Existing Conditions and Trends <br />24 CFR 58.5 Statutory Checklist <br />Environmental Assessment Checklist, covering issues related to <br />land development, socioeconomic concerns, community facilities <br />dnd services, nalurdl resources, dnd other factors (from the 24 <br />CFR 58.6 checklist) <br />At the conclusion of the EA, Rincon will recommend either a Finding <br />of No Significant Impact (FONSI) or a finding of significant impact. If <br />applicable, Rincon will prepare the EA in HERDS directly as a Partner <br />User for City staff's review, and will submit the final environmental <br />review in HEROS after revising per staff comments. <br />Similar to the NEPA process described above, upon receiving an <br />inquiry from the City on a particular project, it will be important to <br />determine early on what level of CEQA review will be required. <br />Rincon's project manager will consider the location, scale, and <br />timeframe of implementation, along with preliminary research of the <br />site and review of the current CEQA Guidelines for all technical <br />studies and environmental documentation. The following is a typical <br />procedure we will employ for an Initial Study -Mitigated Declaration <br />(15-MND) and an Environmental Impact Report (EIR). <br />Citt� Co�rncil 15 — 24 7/6/2021 <br />Rincon onsutants, lnc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.