|
RFP #21-017: On -Call Environmental Review Services for the
<br />LA .''. ��
<br />Housing Division
<br />City of Santa Ana Community Development Agency
<br />,,.1 '_
<br />� k ,� ., f.,a
<br />Project Homekey Due Diligence Studies, Los Angeles County Department of Public Works, Various locations in Los
<br />Angeles County, CA: Project Hornekey is the State of California's response to protecting California's homeless, who are
<br />at high risk for serious illness and are impacted by the COVID-19 pandemic. Administered by the California Department
<br />of Housing and Community Development, $600 mllllon In grant funding was made avallable to local public entitles,
<br />including cities, counties, or other local public entities, to purchase and rehabilitate housing, including existing hotels,
<br />motels, vacant apartment buildings, and other buildings and convert them into interim or permanent, long-term
<br />housing. of the $600 million in Homekey grant funds, $SS0 million was derived from the state's direct allocation of the
<br />federal Coronavirus Aid Relief Funds, and $SD million was derived from the state's General Fund. Converse Consultants
<br />performed Preliminary Keviews, Phase I LbAs, Geologic Hazards Analysis, and Probable Maximum Loss Assessments
<br />(PMLAs) for various sites located in Los Angeles County-
<br />. r A i, I, J M r i d, i 1 1), 1, 1 I l,l if, ' I' 1 I. e p Y I I I' If,
<br />LLG would provide transportation planning and traffic engineering consultation services as needed for the City. LLG is
<br />a well -respected, medium sized firm, comprised of dedicated professionals who serve their clients on a wide variety of
<br />traffic and transportation issues. LLG Principals and Senior Staff are recognized experts in these practice areas and
<br />possess professional registrations in Traffic Engineering, Civil Engineering, or both. LLG's diverse experience and
<br />expertise enable them to provide services to both public agencies and the private sector.
<br />LLG's specialties include-
<br />Traffr Studies for Fnvimn. Dncuments
<br />Traffic Planning, Operations, & Simulation Studies
<br />Traffic Signal Warrant Studies
<br />I raffl.c Impact Studies
<br />Crculation tlements for General Plans & Specific Plans
<br />Construction tone I raffle Control Plans
<br />SR 743/VMT Analyses
<br />Preliminary/Conceptual Fi-ginppring
<br />Shared Parking Demand Forecasting
<br />SiLe ACteS3 and GrculaLion
<br />Irark Signal DeraiEn
<br />Parking Design and PlarinirtE
<br />Mul6modal Analysis
<br />Traffic Signing and Striping Dpsign
<br />Cnnri Streets Conadtmtinn
<br />Sample LLG Project Experience includes:
<br />4th & Mortimer, Santa Ana, CA: LLG prepared a traffic impact analysis report for the 4th & Mortimer Project. The
<br />Project included the development of 169 apartment units and 11,361 SF of retail/commercial floor area. The traffic
<br />study evaluated the proposed Project's near -term and long-term traffic impacts at six key study intersections and also
<br />included analysis for site access. A VMT screening assessment was also competed to evaluate the Project based on
<br />SE743 requirements consistent with OPR and the City of Santa Ana CEQA VMT Analysis guidelines.
<br />First American Plaza 4th and Main Apartments, Santa Ana, CA: LLG prepared a traffic impact analysis report for the
<br />First American Plaza —4th + Main Project. The Project included the development of 220 DU apartment units and 12,350
<br />SF of retail/commercial floor area. The traffic study evaluated the proposed Project's near -term and long-term traffic
<br />impacts at nine key study intersections and also included analysis for site access and internal circulation.
<br />First Street Family Apartments, Santa Ana, CA: LLG prepared a traffic impact analysis report for the First Street Family
<br />Apartments Project, which consists of a 69-unit apartment complex located at 1440 East First Street in the City of Santa
<br />Ana, California. The traffic study evaluated the proposed Project's near -term and long-term traffic impacts at four I<ey
<br />study intersections and also included analysis for site access and internal circulation, including a project gate stacking
<br />analysis.
<br />ra gotIq,,4. .I,'f
<br />Being as the RFP detailed the Reference Form is not counted as part of the maximum page count, this information is
<br />included in Appendix A.
<br />General fee schedules for environmental and planning services and technical studies follow in Appendix A. Being as the
<br />RFP detailed the fee schedule is not counted as part of the maximum page count, this information is included in
<br />Appendix A.
<br />tll�r.�oi City Council
<br />Est
<br />7979
<br />24 15-108
<br />VVWW ( Il I )II i Iu h 1 II L. 1111
<br />7/6/2021
<br />
|