Laserfiche WebLink
RFP #21-017: On -Call Environmental Review Services for the <br />Housing Division <br />City of Santa Ana Community Development Agency <br />dddiLional Ledmicdl andlysiS for air qudliLy, GHG emissions, noise, and traffic. The results from Lhe Lechnicdl reports <br />were incorporated into a Subsequent MND as additional mitigation measures were required for the proposed changes. <br />q/ltshineaaxt f'Yiryr➢!Sr. _li onl I IVA(: aurcf I mirk, & ['ielrl Irnprrsvern! ru,, I. nw Bkm; h klrnh j 'Sr, <br />I rLirrcc QI BI VSD), I (frig Rr-m,h, CA <br />Project Manager. Chambers Group prepared the IS checklist to confirm the appropriate CECtA documentation for the <br />HVAC improvements and turf replacement at Washington Middle School. The improvements included accessibility <br />upgrades as required to meet ADA requirements, utility upgrades, and replacement and repairs for the interior and <br />exterior buildings. The project also included preparation of a Historic Resources Assessment because the school was <br />listed eligible for the National Register of Historic Places, and the Administration Building and Science and Shop Bullding <br />are considered character defining features. <br />I rk,�wcod I hi4i School Tu-,rrf. rt 1-field Projccr I rong, Beach U411hcd S(hocol I (I Rl"I C)), I <br />Bw.ich, I c>, Aurpullus Q:okiiiiy, (A <br />Project Manager. Provided CEQA documentation support for the Lakewood High School Track & Field project which <br />included ADA upgrades, replacing the dirt track with an all-weather surface, and replacing the natural turf field with <br />artificial turf. An IS was completed for the project which included analysis of the campus in a Phase II Historic Resources <br />Assessment. Based on the result of the checklist and technical analysis, a CE was the appropriate CEQA documentation, <br />and a NOE was filed. <br />y f f1 I I <br />l 1'n •l :A) CZr EI"Y�rLL iHiCL7entiA d, �cYn°lEL L:In4; ,�:L'4LCr 2. t.._i( cn +agCa&L Iy f`"hc3a�r �'Arli, r�.A <br />Project Manager. Commencing in September 2019, Chambers Group is working on a series of task orders to support <br />the City with the peer review of project applications and CEQA documents. Chambers Group is providing guidance and <br />assistance through the peer review of technical environmental reports and analyses (traffic studies, noise studies, <br />geologic assessments, etc.) <br />'Superior AhvU'u.re I'rl.lr_,trian and Bicycle FSr'ir gc_ f,leavfx+br L Llcsa_lh)forth* Cr..aurnr,:y, G...'A <br />Project Manager. Chambers Group is working with the City of Newport Beach in the construction of a pedestrian and <br />bicycle bridge overcrossing Superior Avenue, a new larger parking lot with a range of 100 to 128 parking spaces and a <br />fenced dog park on an approximately 3.4-acre site in the City of Newport Beach. The proposed bridge will connect <br />Sunset Ridge Park to the new asphalt parking lot lorated at the nnrtheast corner of West Coast Highway and Superior <br />Avenue. Due to the IocaLion of the project and being partially funded by federal funding, Chambers Group is responsible <br />for preparing CEQA documentation, NEPA documentation and California Coastal Development Permits for the project. <br />Technical Studies (air quality, GHG emissions, energy and noise analyses, initial site assessments, hazardous materials <br />analysis, Coastal California Gnatcatcher focused surveys, visual assessment) and a subsequent IS/MND were prepared <br />as an appropriate CEQA documentation to provide the public and responsible agencies with information about the <br />potential environmental impacts associated with implementation of the proposed Project. This IS/MND Includes a <br />prnjpct-level analysis of the potential efferts assnriated with the Prnjpct. As a part of the NFPA documentatinn, <br />Chambers Group was responsible for coordination with the Caltrans Local District and the resulting preparation of a <br />Categorical Exclusion as the appropriate form of NEPA documentation. <br />I ldrbc,r I'nurr k°urk Lcrc,kroerr 110 1 1'.)Il I rccnsi ou, c,l f:;�Aa [)ocmnr. utatirun, I)tna k'aiutr.., t:"A <br />Project Manager. Meghan is managing the preparation of the IS/MND for the project, which also included incorporating <br />information from a previously prepared Biological Technical Report also prepared by Chambers Group. The project is <br />to install an overlook deck as well as a trail extension from the deck to the existing trail network. Trespassing in attempts <br />to gain access to the view near the cliff edge has become a large issue throughout the preserved open space at Harbor <br />Point. As a result, the area is littered with trash and the vegetation is becorning highly fragmented due to the increase <br />in off trail foot traffic. In addition, the unauthorized access to the cliff edge is a public safety hazard, as there is no railing <br />or fencing present. The proposed overlook location will allow enhanced public access to coastal resources, as well as <br />reduce the overall disturbance and fragmentation of the surrounding habitat. <br />City Council <br />Est <br />-rW' 7979 <br />15— 125 <br />A-20 <br />vvwwL iL i n�' ,,rf L, ) I L. 1111 <br />7/6/2021 <br />