|
RFP #21-017: On -Call Environmental Review Services for the
<br />Housing Division
<br />City of Santa Ana Community Development Agency
<br />/../rl..f nr(; lilt Pr(elr: r,C EiLviionimtimil hfipacr I'`,a•13 oCr,. Li V`xrr'rrt'e, C. A.
<br />Environmental Planner. Eunice worked on preparation of CECA documentation for the 22-unit condominium project
<br />that would include the demolition of a historic theater. The Project included technical analysis for air quality,
<br />greenhouse gas emissions, and a historical assessment.
<br />Civic. (:enter Llo.. ddinrl, 16 L)cniohucyn Initial i uoy/Milu L d r,deg= rtive Dec l ar : don, Oiranfse r:.:cai.uuy
<br />Piib is Wnrkq, Sarmi Ana, ('.A
<br />Assistant Planner. Eunice assisted the preparation of an IS/MND and the MMRP for the demolition of Building 16,
<br />within the Orange County Civic Center. Due to project schedule concerns, the administrative draft of the IS/MND was
<br />prepared in only 1.5 weeks from receipt of notice to proceed. Due to the age of the building required a full historic
<br />resources assessment was conducted.
<br />Avalon 1: 11 Site lntrn r'nvenrc.i rtu lien): c [, I ong, VS each Unified SchnnI 1)istrir i (1 RUS1)), Lorig, Renrh, Los
<br />Angele> County, -CA
<br />Environmental Planner. Eunice drafted the Initial Study Checklist and assisted the Project Manager in incorporating
<br />the technical studies into the Initial Study. The Avalon K-12 Site Improvement project includes installation of HVAC on
<br />campus, replacement of the natural turf baseball field with artificial turf, and various other campus -wide
<br />improvements. Due to the presence of contaminated soils, the CEQA analysis is also including the contaminated soils
<br />removal in the analysis. technical analysis is being prepared including air quality and GHG analysis, noise assessment,
<br />geohazards assessment, and historical resources analysis.
<br />Wa'd,ling,rort Mide1k S-hool I IVA(� and Z rack kdd 1rnproverrn nr,., Long R,,arch Unified Se-hrxd
<br />F)isrt:rir,_rt. Q1 hl..t,If)) I rrnF;; L''i( rr h, Lra. Anp, ter,; G.ounr_y, (_A
<br />Project Manager. Funice prepared the Initial Study checklist to confirm the appropriate CFQA documentation for the
<br />HVAC irnprovernents and turf replacement at Washington Middle School. The irnprovernents included accessibility
<br />upgrades as required to meet ADA requirements, utility upgrades, and replacement and repairs for the interior and
<br />exterior buildings. The project also included preparation of a Historic Resources Assessment because the school was
<br />listed eligible for the National Register of Historic Places, and the Administration Building and Science and Shop Building
<br />are considered character defining features.
<br />�Lirier'ior Avenue Pede•sci-ian and Riryele Rvidge, hleen port Vrmarli, ( range I,. coun[y, ('A
<br />Environmental Planner. Chambers Group is working with the City of Newport Beach in the construction of a pedestrian
<br />and hicycle bridge overcrossing Superior Avenue, a new larger parking lot with a range of 100 to 128 parking spaces
<br />and a fenced dog park on an approximately 3.4-acre site in the City of Newport Beach. The proposed bridge will connect
<br />Sunset Ridge Park to the new asphalt parking lot located at the northeast corner of West Coast Highway and Superior
<br />Avenue. Due to the location of the project and being partially funded by federal funding, Chambers Group is responsible
<br />for preparing CEQA documentation, NEPA documentation and California Coastal Development Permits for the project.
<br />Technical Studies (air quality, GHG emissions, energy and noise analyses, initial site assessments, hazardous materials
<br />analysis, Coastal California Gnatcatcher focused surveys, visual assessment) and a subsequent IS/MND were prepared
<br />as an appropriate CFOA documentation to provide the puhlic and responsible agencies with informatinn about the
<br />potential environmental impacts associated with implementation of the proposed Project. This IS/MND includes a
<br />project -level analysis of the potential effects associated with the Project. As a part of the NEPA documentation,
<br />Chambers Group was responsible for coordination with the Caltrans Local District and the resulting preparation of a
<br />Categorical Exclusion as the appropriate form of NEPA documentation.
<br />City Council
<br />Est
<br />-roar,_ 7979
<br />15— 129
<br />A-24
<br />vvwwr it i n� ' ,,rf ), ) i.;.r;orn
<br />7/6/2021
<br />
|