Laserfiche WebLink
RFP #21-017: On -Call Environmental Review Services for the <br />Housing Division <br />City of Santa Ana Community Development Agency <br />larger pdrking IoL wiLh d range of 100 Lu 128 pdrking spaces and a fenced dog park un an approximately 3.4-acre Site in <br />the City of Newport Beach. The proposed bridge will connect Sunset Ridge Park to the new asphalt parking lot located <br />at the northeast corner of West Coast Highway and Superior Avenue. Due to the location of the project and being <br />partially funded by federal funding, Chambers Group is responsible for preparing CEQA documentation, NEPA <br />documentation and California Coastal Development Permits for the project. Technical Studies (air quality, GHG <br />emisslons, energy and noise analyses, Initial site assessments, hazardous materials analysis, Coastal California <br />Gnatcatcher focused surveys, visual assessment) and a subsequent IS/MND were prepared as an appropriate CEQA <br />documentation to provide the public and responsible agencies with information about the potential environmental <br />impacts associated with implementation of the proposed Project. This IS/MND includes a project -level analysis of the <br />potential effects associated with the Project. As a part of the NEPA documentation, Chambers Group was responsible <br />for coordination with the Caltrans Local District and the resulting preparation of a Categorical LXCILISIon as the <br />appropriate form of NEPA documentation. <br />Dr,- v rt V,rllry C'onfpany Mono -fill C_r,ll rV V xrean;ion Pr'ola rt Z Lnj (rweiring .inr( r',II ur rgy, <br />Impr.rial r:oLUnty <br />Lead Biologist. Cal Energy Operating Corporation (CalEnelgV) in cooperation with the Desert Valley Company (DVC) are <br />proposing the expansion of 1-he existing DVC Monufill Facility Lo establish a new cell (Cell 4). The proposed Cell 4 would <br />be used to deposit nonhazardous waste generated from filter calve and scale formed in the transport, flashing, and <br />handling of geothermal brine frorn a total of four energy generating facilities. Cell 4 Would also be designed to handle <br />soils contaminated with geothermal materials, geothermal drilling muds and cuttings, and incidental plastic sheeting <br />(truck bed liners/material). The additional facilities will allow the existing monofill location to continue Operation, - <br />beyond the expected date the current facilities will reach capacity in 2025. Mr. IVlnrrissey coordinated and led the <br />biological assessrneia, jurisdictional delineations, focused surveys for flartailed horned lizard, burrowing owl, small <br />mammal Lrapping, and rare plant Survey,,, a,, well a,, assisting wiLln design impacLS, penrrii. applica Li«m sLra LegieS, and <br />agency I'neetings to discuss mitigation strategies. <br />()rr a..aI fur LrnrrronrrIQrrCAI C(.itsuIurrt? 'QI'4U_rv, (_df_y c-4 M,)or par Ic, Mof,)rIxirk. ('_A <br />Lead Biologist. Commencing in September 2019, Chambers Group is working on a series of task orders to support the <br />City with the peer review of project applications and CEQA documents. Chambers Group is providing guidance and <br />assistance through the peer review of technical environmental reports and analyses (traffic studies, noise studies, <br />geologic assessments, etc.). <br />Biolog(c aI Surw�ys and Mc,r korinp, R>•r rho- 2012 to 2017 Debris Basins Maurrcnance Pr ojec:f., Lcls <br />Ang-ek ('cmnfy, (A <br />Program Manager. Paul coordinated pre- and past -construction surveys and biological monitoring within 172 debris <br />basins maintained annually by Flood Maintenance Division (FMD) throughout Los Angeles County, California. The <br />surveys are required by the agency permits (401/404/1602) obtained by LACFCD for maintenance activities including <br />mowing/trimming of vegetation and potential sediment removal within the debris basins. Surveys included <br />jurisdictional and wetland delineations, pro and post construction surveys, water quality sampling and analysis, and <br />biological compliance monitoring. Annual reports are prepared and submitted to RWQCB. <br />°,Gl:+fr'.Ver. 'h r>l-0I o-:q![I r a;ny'eC' 1r}rnrrrj.l.7 r,L r..iharincl', rriJ r.: t, Peurt rrtrl rip, rr:.y+3 d,.<arSUfr kan d,.Bi CC`<E rli, <br />F KA <br />r,roiip, r arr on, I cr. Angel , C:,owrly, ( A <br />Lead Biologist. Paul led the tearn that prepared the application packages for the Section 404 nationwide permit for <br />USAGE, Section 401 water quality certification for RWQCB, and Section 1GU2 Strearnbed Alteration Agreement for <br />CDl-W. The project involves widcning the Sepulveda Blvd. bridge over the Dorninguez Charinel by adding a median and <br />sidewalks on both sides of the bridge to improve road safety and reduce traffic congestion by allowing for better traffic <br />circulation. <br />City Council <br />Est <br />-rorr,_ 7979 <br />15— 133 <br />A-28 <br />vvww l h I I� ' ff L, ) II L. 1111 <br />7/6/2021 <br />