My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET 2021-07-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
FULL AGENDA PACKET 2021-07-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2021 12:33:17 PM
Creation date
7/12/2021 9:06:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP No. 21-001 for Pre -Approval Accessory Dwelling Unit Plans <br />Dcsign Path Studio Proposal <br />S. COST PROPOSAL <br />This proposal is for each ADU type (studio, one -bedroom, two -bedroom, and three -bedroom). <br />Each type would include reverse and mirrored floor plans, and up to three roof and cladding design <br />variations based on Santa Ana vernacular styles. <br />UNIT TYPES PROPOSED <br />NUMBEROFUNITS <br />PROPOSED <br />BID AMOUNT <br />Studio, One -bedroom, Two -bedroom, and <br />Three -bedroom <br />1 <br />$15,000 <br />2 <br />$30,000 <br />3 <br />$45,000 <br />4 <br />$60,000 <br />-This Proposal does no( include garage conversion Plans <br />Design Path Studio anticipates completion of all projects tasks and closeout of the project within this <br />calendar year, 2021 (see Project Schedule). Any additional services requested by the City of Santa <br />Ana for the remainder of the contract terms will be billed based on the hourly rate(s) provided. <br />Contract Year-1: $60,000 <br />Contract Year-2: as needed hourly <br />Contract Year-3: as needed hourly <br />Extension: as needed hourly <br />Hourly Fee Schedule: <br />Principal Architect: <br />$175/hr <br />Principal Planner: <br />$150/hr <br />Project Manager: <br />$100/hr <br />Designer: <br />$75/hr <br />Drafter: <br />$75/hr <br />BUDGET NOT TO EXCEED: $60,000 <br />City Council 18 — 19 7i612021 <br />Design Path Studio + checkerboardSTUD1OS - Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.