Laserfiche WebLink
APPENDIX I RESUMES <br />KEN DOWELL, PG, CEG 1 PROJECT GEOLOGIST <br />Mr. Ken Dowell has extensive experience in southern California during planning, design <br />and the construction of commercial and industrial properties, education, residential, <br />and municipal projects. He is experienced in field investigation and mapping, analysis <br />of geologic and environmental data, and report preparation. Projects have included <br />land planning studies, fault investigations, seismic hazard analysis, liquefaction <br />determination, shoring design, landslide investigations, ground fissure investigations, <br />hydrocollapse evaluations, rippability and blasting evaluations, land subsidence <br />evaluations, alluvial removals, cut slope stability, and percolation testing. <br />RELEVANT PROJECT INVOLVEMENT / EXPERIENCE <br />CVWD RESERVOIR 8B, 4177 HAVEN AVENUE, RANCHO CUCAMONGA <br />Project Geologist I Mr. Dowell served as the Project Geologist for the RESERVOIR 8B Project, ensuring that all staff and testing <br />resources are available for this major water project. RMA Group provided geotechnical investigations including, geographical <br />research and reconnaissance of the site, geotechnical exploration, and preparing a detailed report for foundation and footing designs <br />of steel reservoir tanks at Reservoir Site 8B located at 4177 Haven Avenue in the County of San Bernardino. RMA Group preformed <br />mobilization, subsurface field investigation, laboratory testing, geotechnical engineering analysis, and report preparation. <br />CUCAMONGA VALLEY WATER DISTRICT COMMUNICATION TOWERS, RANCHO CUCAMONGA <br />Project Geologist I Mr. Dowell served as the Project Geologist for the Cucamonga Valley Water District Communication Towers <br />Project. RMA Group conducted an investigation to summarize geotechnical and geologic conditions at the sites to assess their <br />potential impact on the proposed development and to develop geotechnical and engineering geologic design parameters. <br />FIRE CAMP 14, SANTA CLARITA <br />Project Geologist I Mr. Dowell was the Project Geologist for the Fire Camp 14 Project. RMA Group performed a geotechnical <br />engineering investigation for the project. The project consisted of a new water storage tank and a 12' x 18' one story prefabricated <br />building water treatment plant building. The tank is on a hillside pad that was occupied by an existing water tank and the plant <br />building is located on the floor of San Francisquito Canyon in an open space building behind another building. <br />THE PRESERVE SEWER LIFT STATION, CHINO <br />Project Geologist I Mr. Dowell served as Project Geologist for The Preserve Sewer Lift Station Project.RMA Group performed <br />geotechnical investigation for a proposed sewer lift station and sewer line extension. Services included a field investigation, laboratory <br />testing and geotechnical engineering design recommendations including temporary slope and trench stability, corrosion analysis, <br />trench excavation and backfill recommendations, dewatering and construction recommendations for to shallow groundwater, drilled <br />pile design recommendations. <br />WHITEWATER RIVER BASIN IMPROVEMENT PROJECT, AVENUE 38 AND WASHINGTON STREET, THOUSAND PALMS <br />Project Geologist I Mr. Dowell was the project Geologist for this project. A geotechnical / foundation investigation and pavement <br />design report has been completed for the proposed reconstruction of the Mirasera Flood Control Channel and relocation of <br />approximately 7,000 feet of Avenue 38 in Thousand Palms, California. The purpose of the study was to summarize geotechnical <br />and geologic conditions at the site, to assess their potential impact on the proposed construction, and to develop geotechnical and <br />engineering geologic design parameters. <br />PROPOSED SEWER MAIN REPLACEMENTS THROUGHOUT RIVERSIDE, RIVERSIDE <br />Project Geologist I Mr. Dowell was the project Geologistfor this project. RMA Group performed geotechnical investigation for sewer <br />main replacements throughout the City of Riverside. Services included a field investigations, laboratory testing, and geotechnical <br />engineering design recommendations including geologic conditions, which included alluvial soil and granitic bedrock encountered in <br />the vicinity of the proposed sewer main replacements. <br />CARLSBAD DESALINATION PLANT [POSEIDON PROJECT], CARLSBAD <br />Project Geologist I Mr. Dowell was assisted with the geotechnical investigation and preparation of soils reports for the Carlsbad <br />Desalination Plant Project. RMA Group provided materials testing and inspection on both the construction of the desalination plant <br />and its associated on -site facilities and of the installation of 10-mile pipeline and the preliminary construction of the Aqueduct <br />Connection Facilities. These phases will ultimately connect the desalination plant with the water supplies in the surrounding cities. <br />n��\ RFP NO: 20-111 1 MATERIALS TESTING & SPECIAL INSPECTION SERVICES <br />RMA Group CITY OF SANTA ANA 20-1600-P SEPTEMBER 30, 2020 Page ill <br />EveryProjzrt Matters I www.rmacompanies.com <br />