APPENDIX I RESUMES
<br />KEN DOWELL, PG, CEG 1 PROJECT GEOLOGIST
<br />Mr. Ken Dowell has extensive experience in southern California during planning, design
<br />and the construction of commercial and industrial properties, education, residential,
<br />and municipal projects. He is experienced in field investigation and mapping, analysis
<br />of geologic and environmental data, and report preparation. Projects have included
<br />land planning studies, fault investigations, seismic hazard analysis, liquefaction
<br />determination, shoring design, landslide investigations, ground fissure investigations,
<br />hydrocollapse evaluations, rippability and blasting evaluations, land subsidence
<br />evaluations, alluvial removals, cut slope stability, and percolation testing.
<br />RELEVANT PROJECT INVOLVEMENT / EXPERIENCE
<br />CVWD RESERVOIR 8B, 4177 HAVEN AVENUE, RANCHO CUCAMONGA
<br />Project Geologist I Mr. Dowell served as the Project Geologist for the RESERVOIR 8B Project, ensuring that all staff and testing
<br />resources are available for this major water project. RMA Group provided geotechnical investigations including, geographical
<br />research and reconnaissance of the site, geotechnical exploration, and preparing a detailed report for foundation and footing designs
<br />of steel reservoir tanks at Reservoir Site 8B located at 4177 Haven Avenue in the County of San Bernardino. RMA Group preformed
<br />mobilization, subsurface field investigation, laboratory testing, geotechnical engineering analysis, and report preparation.
<br />CUCAMONGA VALLEY WATER DISTRICT COMMUNICATION TOWERS, RANCHO CUCAMONGA
<br />Project Geologist I Mr. Dowell served as the Project Geologist for the Cucamonga Valley Water District Communication Towers
<br />Project. RMA Group conducted an investigation to summarize geotechnical and geologic conditions at the sites to assess their
<br />potential impact on the proposed development and to develop geotechnical and engineering geologic design parameters.
<br />FIRE CAMP 14, SANTA CLARITA
<br />Project Geologist I Mr. Dowell was the Project Geologist for the Fire Camp 14 Project. RMA Group performed a geotechnical
<br />engineering investigation for the project. The project consisted of a new water storage tank and a 12' x 18' one story prefabricated
<br />building water treatment plant building. The tank is on a hillside pad that was occupied by an existing water tank and the plant
<br />building is located on the floor of San Francisquito Canyon in an open space building behind another building.
<br />THE PRESERVE SEWER LIFT STATION, CHINO
<br />Project Geologist I Mr. Dowell served as Project Geologist for The Preserve Sewer Lift Station Project.RMA Group performed
<br />geotechnical investigation for a proposed sewer lift station and sewer line extension. Services included a field investigation, laboratory
<br />testing and geotechnical engineering design recommendations including temporary slope and trench stability, corrosion analysis,
<br />trench excavation and backfill recommendations, dewatering and construction recommendations for to shallow groundwater, drilled
<br />pile design recommendations.
<br />WHITEWATER RIVER BASIN IMPROVEMENT PROJECT, AVENUE 38 AND WASHINGTON STREET, THOUSAND PALMS
<br />Project Geologist I Mr. Dowell was the project Geologist for this project. A geotechnical / foundation investigation and pavement
<br />design report has been completed for the proposed reconstruction of the Mirasera Flood Control Channel and relocation of
<br />approximately 7,000 feet of Avenue 38 in Thousand Palms, California. The purpose of the study was to summarize geotechnical
<br />and geologic conditions at the site, to assess their potential impact on the proposed construction, and to develop geotechnical and
<br />engineering geologic design parameters.
<br />PROPOSED SEWER MAIN REPLACEMENTS THROUGHOUT RIVERSIDE, RIVERSIDE
<br />Project Geologist I Mr. Dowell was the project Geologistfor this project. RMA Group performed geotechnical investigation for sewer
<br />main replacements throughout the City of Riverside. Services included a field investigations, laboratory testing, and geotechnical
<br />engineering design recommendations including geologic conditions, which included alluvial soil and granitic bedrock encountered in
<br />the vicinity of the proposed sewer main replacements.
<br />CARLSBAD DESALINATION PLANT [POSEIDON PROJECT], CARLSBAD
<br />Project Geologist I Mr. Dowell was assisted with the geotechnical investigation and preparation of soils reports for the Carlsbad
<br />Desalination Plant Project. RMA Group provided materials testing and inspection on both the construction of the desalination plant
<br />and its associated on -site facilities and of the installation of 10-mile pipeline and the preliminary construction of the Aqueduct
<br />Connection Facilities. These phases will ultimately connect the desalination plant with the water supplies in the surrounding cities.
<br />n��\ RFP NO: 20-111 1 MATERIALS TESTING & SPECIAL INSPECTION SERVICES
<br />RMA Group CITY OF SANTA ANA 20-1600-P SEPTEMBER 30, 2020 Page ill
<br />EveryProjzrt Matters I www.rmacompanies.com
<br />
|