Laserfiche WebLink
W. A. Rasic Construction <br />4150 Long Beach Blvd. <br />Long Beach, CA 90807 <br />SCOPE OF SERVICES <br />CLIENT: The City of Santa Ana <br />PROJECT: Sewer System Repair Services - RFP No. 21-036 <br />WAR PROJECT NUMBER: S430A <br />Date: 19-Jan-21 <br />1 <br />Repair/Replace 6 or 8" Sewer Main (min. 6' section up to 8' deep) <br />500 Linear Feet <br />1.1 <br />Daily Traffic Control (inc. road plates) <br />1.2 <br />Sawcut AC <br />1.3 <br />Excavation to Expose Line Break (6'-8' Deep) <br />1.4 <br />Plug Broken Line at the Upstream Manhole <br />1.5 <br />Suction Truck for Sewage Removal at Manhole & Excavation Site <br />1.6 <br />Repair Line Break (inc. pipe & fitting purchase) <br />1.7 <br />Unplug Broken Line at the Upstream Manhole <br />1.8 <br />1/2" Rock Bedding & SE30 Full Backfill (Std. Plan 1150) <br />1.9 <br />AC Restoration <br />1.10 <br />Spoil Disposal <br />2 <br />Repair/Replace 6 or 8" Sewer Main (6' section at 8'-12' deep) <br />250 Linear Feet <br />2.1 <br />Daily Traffic Control (inc. road plates) <br />2.2 <br />Sawcut AC <br />2.3 <br />Excavation to Expose Line Break (8'-12' Deep) <br />2.4 <br />Plug Broken Line at the Upstream Manhole <br />2.5 <br />Suction Truck for Sewage Removal at Manhole & Excavation Site <br />2.6 <br />Repair Line Break (inc. pipe & fitting purchase) <br />2.7 <br />Unplug Broken Line at the Upstream Manhole <br />2.8 <br />1/2" Rock Bedding & SE30 Full Backfill (Std. Plan 1150) <br />2.9 <br />AC Restoration <br />2.10 <br />Spoil Disposal <br />3 <br />Repair/Replace 10 or 12" Sewer Main (6' section not more than 8' deep) <br />100 Linear Feet <br />3.1 <br />Daily Traffic Control (inc. road plates) <br />3.2 <br />Sawcut AC <br />3.3 <br />Excavation to Expose Line Break (6'-8' Deep) <br />3.4 <br />Plug Broken Line at the Upstream Manhole <br />3.5 <br />Suction Truck for Sewage Removal at Manhole & Excavation Site <br />3.6 <br />Repair Line Break (inc. pipe & fitting purchase) <br />3.7 <br />Unplug Broken Line at the Upstream Manhole <br />3.8 <br />1/2" Rock Bedding & SE30 Full Backfill (Std. Plan 1150) <br />3.9 <br />AC Restoration <br />3.10 <br />Spoil Disposal <br />4 <br />Repair/Replace 10 or 12" Sewer Main (6' section at 8'-12' deep) <br />100 Linear Feet <br />4.1 <br />Daily Traffic Control (inc. road plates) <br />4.2 <br />Sawcut AC <br />4.3 <br />Excavation to Expose Line Break (8'-12' Deep) <br />4.4 <br />Plug Broken Line at the Upstream Manhole <br />4.5 <br />Suction Truck for Sewage Removal at Manhole & Excavation Site <br />4.6 <br />Repair Line Break (inc. pipe & fitting purchase) <br />4.7 <br />Unplug Broken Line at the Upstream Manhole <br />4.8 <br />1/2" Rock Bedding & SE30 Full Backfill (Std. Plan 1150) <br />4.9 <br />AC Restoration <br />4.10 <br />Spoil Disposal <br />7/20/2021 <br />City Council 13 - 29 <br />