My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RINCON CONSULTANTS, INC. (3)
Clerk
>
Contracts / Agreements
>
R
>
RINCON CONSULTANTS, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2024 12:01:02 PM
Creation date
7/27/2021 4:13:26 PM
Metadata
Fields
Template:
Contracts
Company Name
RINCON CONSULTANTS, INC.
Contract #
A-2021-110-01
Agency
Community Development
Council Approval Date
7/6/2021
Expiration Date
7/31/2022
Insurance Exp Date
2/1/2024
Destruction Year
2027
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EDUCATION <br />BS, Environmental Science, <br />University of California, Los <br />Angeles <br />YEARS OF <br />EXPERIENCE <br />Rlncon Consultants, Inc. <br />Environmental Scientists • Planners - Engineers <br />Vanessa Villanueva <br />Associate Environmental Planner <br />Ms. Villanueva responsible for preparing environmental and planning documents, <br />assisting with public and private sector contract planning services, and providing <br />technical impact analyses for a variety of projects. She has experience preparing and <br />editing environmental analyses in accordance with CEQA and NEPA for infrastructure, <br />housing and urban development, and long-range planning projects. Her <br />responsibilities include performing research and analysis and/or completing <br />assignments within agency offices and for private sector clients; preparing CEQA and <br />NEPA environmental assessments and technical studies, including air quality, energy, <br />greenhouse gas, and noise studies; assisting with the preparation of General Plans <br />and other comprehensive planning documents; conducting and coordination noise - <br />monitoring efforts; and interacting with various members of public agency and <br />private client staff on matters related to land use planning, CEQA/NEPA compliance, <br />and land development application processing. <br />SELECT PROJECT EXPERIENCE <br />Development Projects <br />Assistant Project Manager/Noise Analyst, City of Santa Ana — Westview Housing <br />Project IS-MND, Santa Ana <br />Ms. Villanueva served as an assistant project manager for an IS-MND for construction <br />of 85 apartment units within two 3- to 4-story buildings and 136 parking spaces on a <br />2.1-acre project site. All units, except the manager's unit, would be designated as <br />affordable housing units. Her responsibilities included internal management of a <br />team and coordination between the team and City staff. Ms. Villanueva also <br />conducted the noise and vibration analysis, including necessary technical modeling, <br />for the IS-MND. <br />Project Manager/Technical Analyst, The Ketter Group —Technical Studies for CEQA <br />Class 32 (In -Fill Development) Categorical Exemptions, Los Angeles <br />Ms. Villanueva has managed various technical air quality and noise studies for CEQA <br />Class 32 (in -fill development) project applications for multi -family housing projects. <br />Her responsibilities have included conducting noise -monitoring, technical modeling, <br />and coordinating a team to prepare these studies. Typical project's include low- to <br />mid -rise mixed -use or multi -family development with units allocated toward low- <br />income individuals or families. <br />CEQA/Technical Analyst, City of Walnut —The Terraces at Walnut Specific Plan EIR, <br />Walnut <br />Ms. Villanueva served as a CEQA and technical analyst in assisting the City of Walnut <br />with an EIR for a proposed Specific Plan, which involved a mixed -use infill project that <br />included various housing types, a commercial district, parks and recreation areas, and <br />open space, such as landscaped slopes, on 49 acres of vacant land. The major issues <br />of concern were associated with impacts to aesthetics, biological resources, noise and <br />transportation. Her responsibilities included conducting on -site noise monitoring and <br />drafting the noise and vibration analysis as well as the air quality and greenhouse <br />gases analysis for the EIR. <br />
The URL can be used to link to this page
Your browser does not support the video tag.