My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-08-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
AGENDA PACKET_2021-08-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 10:44:37 AM
Creation date
8/17/2021 10:40:21 AM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />4. NFPA 79 - Electrical Requirements for Machinery <br /> <br />E. Occupational Safety and Health Administration (OSHA): <br />1. Title 29 Code of Federal Regulations <br /> <br />F. Department of Industrial Relations - California Code of Regulations (CCR): <br /> <br />1. CCR - Title 8, Industrial Relations <br /> <br />G. California Building Code (CBC) <br /> <br />H. California Fire Code (CFC) <br /> <br />I.CaliforniaElectricalCode(CEC) <br /> <br />J. Occupational Safety and Health Association (OSHA) <br /> <br />K. American Gas Association (AGA) <br /> <br />L. American Petroleum Institute (API) <br /> <br />1.4 SUBMITTAL$ <br /> <br />A. General: Provide electronic submittals for distribution as follows: one for the City's <br />records, one for the City's Engineer, one for the Contractor and one for return with <br />comments to the vendor. <br /> <br />B. Shop Drawings: Indicate piping system schematic with electrical and connection <br />requirements,generalassemblyofcomponents,mountingandinstallationdetails,and <br />general layout of all control and alarm panels. <br /> <br />C. Product Data: System Components: Submit manufacturers' catalogue information <br />including capacity, component sizes, rough-in requirements, and service sizes. When <br />applicable, include electrical characteristics and connection requirements. <br /> <br />D. Calculations: Provide equipment run sheets or similar information to demonstrate <br />compliance with stated performance requirements for equipment. Provide anticipated <br />foundation loads and anchorage requirements for installation at the project site. <br /> <br />E.AcousticalData:Providetestreportdataforacousticalenclosuretodemonstrate <br />compliancewithspecifications. <br />1.5 QUALITY ASSURANCE <br />CityofSantaAna-RFP20-095 <br /> <br />CNGFuelStation:Design,Build,OperateandMaintain <br />14 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.