My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-08-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
AGENDA PACKET_2021-08-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 10:44:37 AM
Creation date
8/17/2021 10:40:21 AM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />B. Time-fill System Inlet Filters <br /> <br />Two inline coalescing filters shall be connected above ground to the pipe or stainless <br />steel tube at the inlet to the time-fill system. The two coalescing filters shall capture <br />aerosol and solid particles greater than 0.6 microns and 0.2 microns, respectively. Each <br />filter shall have a design pressure not less than 5000 psig. Filter element replacement <br />shall be performed without removing the connection piping or tubing. Filters shall be <br />Parker Finite J2 or approved equal with a block and bleed drain system installed on <br />each filter housing. Filter housings shall be installed with double ferrule fittings. <br />CityofSantaAna-RFP20-095 <br />CNGFuelStation:Design,Build,OperateandMaintain <br />27 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.