My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-08-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
AGENDA PACKET_2021-08-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 10:44:37 AM
Creation date
8/17/2021 10:40:21 AM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Dear City of Santa Ana, <br /> <br />TruStar Energy is pleased to offer the following proposal for a time-fill station at the following location: <br /> <br />215 S. Center St, <br />Santa Ana, CA 92703 <br /> <br /> <br /> This 100% turnkey proposal addresses the following requirements: <br />• Design, Planning, Permitting, Equipment, Construction, Start Up and Training <br /> <br />This proposal includes 2 compressor(s) and 40 time-fill hoses <br />Use the table below to determine the production capability of this proposal <br />COMPRESSOR PERFORMANCE CAPACITY \[1 DGE = 1.39 cubic feet / 1 GGE = 1.267 cubic feet\] <br /> <br />Compressor Per Min. Per Min. Per Hr. Per Hr. Per 7 Hr. Per 7 Hr. Per 10 Hr. Per 10 Hr. <br />ProductionProductionProductionProduction Production Production Production Production <br />GGE DGE GGEDGE GGE DGE GGE DGE <br />1 1.66 1.5 99.52 90.22 696.67 631.51 995.24 902.16 <br /> <br />2 3.32 3.01 199.04 180.44 1393.33 1263.02 1990.48 1804.32 <br /> <br />The Time-Fill Station as quoted has the following dispensing capabilities. <br />Equipment: <br /> Time fill 1 vehicle with 25 DGE in: 0.14 hours <br /> Time fill 10 vehicles with 25 DGE in: 1.39 hours <br /> Time fill 30 vehicles with 25 DGE in: 4.16 hours <br /> Time fill 50 vehicles with 25 DGE in: 6.93 hours <br />Time fill 75 vehicles with 25 DGE in: 10.39 hours <br />The compression scenario is based off of an inlet pressure of 30 PSIG with adequate flow. Lower pressures <br />will affect the production by lowering the per minute/hour production. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Steve Breeze <br />TruStar Energy Sales Representative <br />TruStar Energy – 10225 Philadelphia Court, Rancho Cucamonga, 91730 • 909-793-3700 • (fax) 909-793-8056 • www.trustarenergy.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.