Laserfiche WebLink
maximize the entire systems capabilities and ensure trucks get the maximum allowable CNG on board <br />with each fill. <br /> <br />Micromotion CNG050 Meter – 4 - Included <br />Micromotion Meter CNG050 - 40 to 4444 scfm capacity constructed of stainless steel, pressure rated to <br />5,000 psi. Temperature rated from -40°F to +247°F. Mass flow accuracy to ± .5%. Rated for hazardous <br />area installation. Weights and Measures rated. Reads in liters, DGE, or GGE. All-weather rated. <br /> <br />20’ Dual-Head LED Parking Lot Light – 1 Included <br />A dual 400-watt LED lamp mounted on a one-piece aluminum post. Each lamp enclosure measures 15" <br />x 22". This light post includes dual LED lamp enclosures. The light post is 20' in height and mounted in a <br />18' concrete caisson. <br />Start Up and Commissioning- Included <br />TruStar Energy will commission the station and provide on-site training on equipment to mechanics that <br />will include all maintenance and operations requirements. Mechanic will work with TruStar Energy <br />trainer during start up to understand all required maintenance and operations requirements. <br /> <br />Pricing and RNG Credit Summary: <br /> <br />Phase 1 <br />Design, Engineering & Permits:$104,339.80 <br />Total Phase 1 Contract Price: <br />$104,339.80 <br /> <br />Phase 2* <br /> <br />Equipment Procurement: $778,351.14 Phase 2 - Equipment <br />Construction & Installation: $1,172,982.50 Phase 2 - Construction <br />Project Management & Commissioning: $239,168.59 Phase 2 - Construction <br />Freight & Mobilization: $33,750.00 Phase 2 - Equipment <br />RNG Credit/Lump Sum: ($540,000.00) <br />Total Phase 2 Contract Price: <br />$1,684,252.23 <br />th <br />*Phase 2 pricing expires June 30, 2021 and will be revised to reflect cost increases incurred, if any, by TruStar <br />Energy. Phase 2 will commence upon mutual agreement of updated pricing and receipt Notice to Proceed. <br /> <br />TruStar Energy will receive all RNG credit value up to 110,000 GGE per year for 10 years. <br /> <br />Actual usage will be audited at the end of each calendar year by TruStar Energy and verified by City of Santa <br />Ana. RNG credits will be reconciled as follows: <br />- TruStar Energy will pay City of Santa Ana $0.67/GGE for all volume over 110,000 GGE annually. <br />- City of Santa Ana will pay TruStar Energy $0.67/GGE for any shortfall of volume below 110,000 GGE <br />annually. <br /> <br /> <br /> <br />TruStarEnergy-10225 PhiladelphiaCourt,RanchoCucamonga,91730•909-793-3700•(fax)909-793.jj()56•www.trusatrenergy.com <br /> <br />